Browse
Search
Agenda - 05-26-2015 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 2:34:57 PM
Creation date
5/18/2015 12:14:59 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
144 <br /> 2. Illustrate the appropriate sight distance triangles for all existing and proposed driveways <br /> and the proposed pedestrian crossing. <br /> Response: Site distance triangles have been added as requested on the entrances at <br /> Public Rights of Way. <br /> 3. Please show location of internal directional signage providing information to motorists <br /> and pedestrians on the location of parking,drop off areas, school buildings,facilities,etc. <br /> Response:Please see Sheet TP-1.ror proposed directional signage. <br /> 4. Indicate AM/PM peak hour trip generation information on the cover sheet. <br /> Response: Please see Sheet TP-1 for trip generation information per MSTA. <br /> 5. Illustrate the drop-off and pick up areas with the relative amount of car storage. <br /> Response:Please see Sheet TP-1 for drop-off and pick up areas and car storage. <br /> 6. Indicate on-site and off-site (e.g. NCDOT) signage that will be proposed to avoid <br /> confusion and delays during student pick up drop off periods. <br /> Response: Please see Sheet TP-1 for proposed on-site directional signage. Off-site <br /> signage will be installed as needed per NCDOT direction. <br /> 7. Illustrate internal pedestrian walks ways and off-street parking cross walks (e.g. the <br /> crossing from the parking to the Gazebo/coffee stand student parent collection area. <br /> Response: Please see Sheet TP-1 for proposed cross walks. Please note that coffee <br /> stand has been eliminated to help improve traffic flow on-site. <br /> 8. Illustrate parent off-street parking areas (e.g. areas where parents park and escort children <br /> to Gazebo. <br /> Response: Please see Sheet TP-1 for proposed parking areas. <br /> V. SOLID WASTE: <br /> 1. Request for master trash and recycling plan illustrating areas for solid waste pick and/or <br /> disposal areas. Note,this may be contracted privately but the areas need to be defined to <br /> ensure no site conflicts(e.g.utility lines and parking). <br /> Response: Solid waste and recycling pickup is located just uphill from the existing <br /> lower school building newt to the access road leading behind the building. Pickup is <br /> alwahs done outside of school hours. <br /> VI. PROGRAMMING: <br /> 1. Outline on the Master Plan (and in the narrative) activities beyond normal school <br /> operations that may occur(e.g. internal and/or external programs anticipated in the Gym, <br /> Eurhythmy, Auditorium and Arts Center, Ball field). This should demonstrate intensity, <br /> frequency,type of use and special provisions. <br /> For example, the Auditorium is envisioned to have XX specials events each year <br /> consisting of YY activities with ZZ participants. <br /> Response:Please see the narrative for requested information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.