Browse
Search
Agenda - 05-26-2015 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 2:34:57 PM
Creation date
5/18/2015 12:14:59 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( 135 <br /> to be disturbed. Such protective devices shall <br /> effectively protect the critical root zones, <br /> trunks, and tops of trees to be retained and <br /> shall be maintained until all work has been <br /> completed. <br /> 5. Please provide the following note: <br /> Native, non-invasive, and drought tolerant <br /> species shall be used where additional <br /> landscape areas are proposed. <br /> 6. Add a note indicating that all site plans submitted to the <br /> County proposing development of buildings, consistent with <br /> this Master Plan, shall contain all required documentation <br /> demonstrating compliance with the specific landscaping and <br /> buffer regulations contained within Section 6.8 of the LIDO. <br /> IV. SITE ACCESS: <br /> 1. Please evaluate the proposed ingress/egress for vehicular and pedestrian <br /> movements at New Jericho Road and on-site. Your evaluation should address <br /> staff concerns that: <br /> a. Left turn delays may create stacking onto the public right-of-way; <br /> b. The drop offs (aka "kiss and go") lane may create internal delays; <br /> c. The pedestrian crossing at Mill House Road to the athletic field may be <br /> unsafe and improperly located given the existing roadway and property <br /> topography; <br /> d. NC DOT and County staff are still reviewing the possible need for <br /> external traffic improvements (i.e. a turn land on Millhouse Road and/or <br /> New Jericho Road for example) as we continue to review the <br /> submitted Traffic Impact Assessment. <br /> 2. Illustrate the appropriate sight distance triangles for all existing and proposed <br /> driveways and the proposed pedestrian crossing. <br /> 3. Please show location of internal directional signage providing information to <br /> motorists and pedestrians on the location of parking, drop off areas, school <br /> buildings, facilities, etc. <br /> 4. Indicate AM/PM peak hour trip generation information on the cover sheet. <br /> 5. Illustrate the drop-off and pick up areas with the relative amount of car storage. <br /> 6. Indicate on-site and off-site (e.g. NCDOT) signage that will be proposed to avoid <br /> confusion and delays during student pick up drop off periods. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.