Browse
Search
Agenda - 05-26-2015 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 2:34:57 PM
Creation date
5/18/2015 12:14:59 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
125 <br /> Emerson Waldorf School <br /> Traffic Impact Analysis <br /> from the northeast using Millhouse Road and 49% of the projected trips will <br /> approach / depart the site from the west using Millhouse Road. The distribution <br /> percentages were applied to the generated trips to predict routes and project <br /> traffic volumes for the 2030 build-out scenario. <br /> I <br /> IV. Traffic Operations Analysis <br /> As is typical for a traffic impact analysis, each of the study area intersections <br /> were first analyzed under existing conditions. The intersections (existing and <br /> future) were then analyzed with and without the addition of site traffic during the <br /> project build-out year (2030). Next, mitigated improvements were introduced to <br /> the network so that each intersection either operated at a LOS D (or better) or <br /> operated at a LOS equal to or better than the without site traffic condition. <br /> For this analysis, the following four conditions were evaluated: <br /> Condition 1: 2014 Existing Traffic <br /> Condition 2: Build-Out Year (2030) Without Site Traffic <br /> Condition 3: Build-Out Year (2030) With Site Traffic <br /> Condition 4: Build-Out Year (2030) With Site Traffic & Mitigated Improvements <br /> j <br /> Table ES-2 shows the (critical intersection movement) results of the intersection <br /> analyses for each Condition. j <br /> I <br /> ES-8 S 1, ' , <br />
The URL can be used to link to this page
Your browser does not support the video tag.