Browse
Search
Agenda - 05-26-2015 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-26-2015 - Quarterly Public Hearing
>
Agenda - 05-26-2015 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2025 2:34:57 PM
Creation date
5/18/2015 12:14:59 PM
Metadata
Fields
Template:
BOCC
Date
5/26/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Agenda - 05-26-2015 - Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2015\Agenda - 05-26-2015 - Quarterly Public Hearing
Minutes 05-26-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( 10 <br /> SUBMITTAL INFORMATION Per Section 2.7.3 of the Unified Development Ordinance (UDO), all <br /> Class A Special Use Permit applications are required to submit the following: <br /> 1) 26 copies of a site plan prepared by a registered North Carolina land surveyor, landscape architect, architect, or <br /> engineer containing all required information detailed within Section 2.5 of the UDO. This site plan will also need to <br /> contain all relevant information demonstrating that the proposed special use compliance with all general and specific <br /> standards governing the proposed special use as detailed within Article(s)5 and 6 of the UDO. <br /> 2) A detailed narrative outlining the proposed land use including operational requirements, the location of facility, <br /> appearance,etc., <br /> 3) Documentation establishing compliance with Section 5.3.2 inclusive of the UDO. <br /> 4) The names and addresses of the owners involved with the project, <br /> 5) A list of property owners within 500 feet of the subject parcel and the name and address of each property owner,as <br /> currently listed in the Orange County tax records, <br /> 6) Elevations of all structures proposed to be used in the development, <br /> 7) 26 copies of the Environmental Assessment and/or Environmental Impact Statement if required by Section 6.16 of the <br /> UDO, <br /> 8) Statement outlining the anticipated development schedule for the completion of the project, <br /> ** NOTE: It should be remembered that the review of all special use permit applications/modifications <br /> are carried out in a quasi-judicial format meaning that decisions relating to the approval or denial of an <br /> application are based solely on the sworn testimony of all parties involved with the case, both those for <br /> r and against an application, as well as the review of competent material and substantial evidence <br /> submitted during the public hearing. <br /> Further the applicant has the burden of establishing, by the submission of competent material and <br /> substantial evidence, the existence of facts and conditions that demonstrate the projects compliance with <br /> -the various requirements and standards detailed within the Unified Development Ordinance. ** <br /> I (we), the undersigned, have been made aware of the process for the review and action associated with a <br /> Class A Special Use Permit application and understand that only completed applications, containing all <br /> information required by the Orange County UDO shall be reviewed and acted upon by the County. <br /> I (we) understand that it shall be my (our) responsibility to present evidence to the County in the form of <br /> sworn testimony, exhibits, documents, models, plans, and the like support the request for approval of the <br /> Class A Special Use Permit. <br /> Further I (we) understand that any assistance I (we) may receive from County staff in preparing this <br /> application in no way guarantees a favorable recommendation by staff on the merits of this proposal nor does <br /> it guarantee an approval of the request by the County. <br /> kz- <br /> Applicant Date: <br /> Applicttitt Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.