Browse
Search
Agenda - 05-19-2015 - 6i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-19-2015 - Regular Mtg.
>
Agenda - 05-19-2015 - 6i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 9:54:43 AM
Creation date
5/15/2015 9:01:51 AM
Metadata
Fields
Template:
BOCC
Date
5/19/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6i
Document Relationships
2015-218 Interlocal Agreement - OWASA Relating to Design of a Sewer Main Extension Project in the Rogers Road Area
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Minutes 05-19-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Force and the Rogers Road Neighborhood outreach to be completed by the Jackson <br />Center. The governing boards of each town subsequently authorized moving forward on these <br />items. <br />On May 8, 2014 the OWASA Board of Directors approved the Interlocal Agreement relating to <br />OWASA's assistance to Orange County in planning for extension of Wastewater System <br />Improvements to the Rogers Road Area (See Attachment 1). <br />The Board of Commissioners approved the Interlocal Agreement on June 3, 2014. <br />Next Steps: <br />The preliminary engineering study to provide sewer to the 86 parcels identified by the Task <br />Force was completed in March 2015. Based on the findings from the study, the consultant has <br />estimated the project costs to install 3.5 miles of sewer lines at $5.7 million to include <br />engineering design, permitting, bidding, construction, construction administration, construction <br />observation and contingency. This amount does not include costs for private plumbing <br />installation, easement acquisition or OWASA connection fees. OWASA will work with the <br />County, Towns and consultant to develop estimates for these costs as the project proceeds. <br />Staff estimates it will take no less than two years to design, permit, bid and construct the sewer <br />lines (the easement acquisition process can impact the schedule). <br />Understanding the importance of keeping the project moving, Orange County and OWASA have <br />developed the attached inter -local agreement for Board consideration to continue OWASA's <br />management of the next phase of the project (engineering design and permitting) to begin in <br />July 2015. Staff estimates the cost of design and permitting at about $370,000 (not including <br />easement acquisition) and it will take about a year to complete. <br />The next step is to approve the Interlocal agreement with Orange Water and Sewer Authority <br />( OWASA) for the design of the wastewater collection system improvements in the Historic <br />Rogers Road Neighborhood (Attachment 2). <br />FINANCIAL IMPACT: The total cost to the County (43 %) for the design of the wastewater <br />collection system improvements in the Historic Rogers Road Neighborhood is $159,100. <br />RECOMMENDATION(S): The Manager recommends that the Board approve and authorize the <br />Chair to sign the Interlocal Agreement with Orange Water and Sewer Authority ( OWASA) for the <br />design of the wastewater collection system improvements in the Historic Rogers Road <br />Neighborhood (Attachment 2). <br />
The URL can be used to link to this page
Your browser does not support the video tag.