Browse
Search
Agenda - 05-19-2015 - 6i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-19-2015 - Regular Mtg.
>
Agenda - 05-19-2015 - 6i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 9:54:43 AM
Creation date
5/15/2015 9:01:51 AM
Metadata
Fields
Template:
BOCC
Date
5/19/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6i
Document Relationships
2015-218 Interlocal Agreement - OWASA Relating to Design of a Sewer Main Extension Project in the Rogers Road Area
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Minutes 05-19-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3 <br />OWASA HRRA Sanitary Sewer Extension — Project Schedule <br />. Tasks <br />15 <br />Months <br />3 4 5 6 7 8 i 9 1 30 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 <br />Days <br />* Notice to Proceed 1. Time may vary due to additional investigations, review, collaboration, and final corridor alignment <br />O Public Outreach Meetings selection. <br />2. Time may vary due to the number of additional soil investigations, buffer and wetland delineation, and <br />Q Deliverable additional historical /archaeological investigations required. <br />• Review Meetings 3. Time may vary due to easement acquisition and land appraisals (if needed). <br />4. Time may vary due to permitting agency approval process and if unusual permitting issues arise. <br />5. Time may vary due to rebid (if needed) or if legal issues arise. <br />6. Construction time could change due to unknown excavation issues and abnormal weather issues. <br />Exhibit 5 of the Historic Rogers Road Area Sanitary Sewer <br />Extension Preliminary Engineering and Field Investigations <br />Report - March 2015 (prepared by URS for OWASA) <br />Notice to Proceed <br />Overall Design <br />Preli,minary and <br />,. <br />Fina <br />■� <br />■��� <br />Investigatio <br />i� <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■■ <br />-.: <br />Permitting <br />MR • <br />■■■■■■■■■■CCQ.!■■■■■■■■■ <br />Constructlion <br />* Notice to Proceed 1. Time may vary due to additional investigations, review, collaboration, and final corridor alignment <br />O Public Outreach Meetings selection. <br />2. Time may vary due to the number of additional soil investigations, buffer and wetland delineation, and <br />Q Deliverable additional historical /archaeological investigations required. <br />• Review Meetings 3. Time may vary due to easement acquisition and land appraisals (if needed). <br />4. Time may vary due to permitting agency approval process and if unusual permitting issues arise. <br />5. Time may vary due to rebid (if needed) or if legal issues arise. <br />6. Construction time could change due to unknown excavation issues and abnormal weather issues. <br />Exhibit 5 of the Historic Rogers Road Area Sanitary Sewer <br />Extension Preliminary Engineering and Field Investigations <br />Report - March 2015 (prepared by URS for OWASA) <br />