Attachment 3 <br />OWASA HRRA Sanitary Sewer Extension — Project Schedule <br />. Tasks <br />15 <br />Months <br />3 4 5 6 7 8 i 9 1 30 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 <br />Days <br />* Notice to Proceed 1. Time may vary due to additional investigations, review, collaboration, and final corridor alignment <br />O Public Outreach Meetings selection. <br />2. Time may vary due to the number of additional soil investigations, buffer and wetland delineation, and <br />Q Deliverable additional historical /archaeological investigations required. <br />• Review Meetings 3. Time may vary due to easement acquisition and land appraisals (if needed). <br />4. Time may vary due to permitting agency approval process and if unusual permitting issues arise. <br />5. Time may vary due to rebid (if needed) or if legal issues arise. <br />6. Construction time could change due to unknown excavation issues and abnormal weather issues. <br />Exhibit 5 of the Historic Rogers Road Area Sanitary Sewer <br />Extension Preliminary Engineering and Field Investigations <br />Report - March 2015 (prepared by URS for OWASA) <br />Notice to Proceed <br />Overall Design <br />Preli,minary and <br />,. <br />Fina <br />■� <br />■��� <br />Investigatio <br />i� <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■ <br />■■ <br />-.: <br />Permitting <br />MR • <br />■■■■■■■■■■CCQ.!■■■■■■■■■ <br />Constructlion <br />* Notice to Proceed 1. Time may vary due to additional investigations, review, collaboration, and final corridor alignment <br />O Public Outreach Meetings selection. <br />2. Time may vary due to the number of additional soil investigations, buffer and wetland delineation, and <br />Q Deliverable additional historical /archaeological investigations required. <br />• Review Meetings 3. Time may vary due to easement acquisition and land appraisals (if needed). <br />4. Time may vary due to permitting agency approval process and if unusual permitting issues arise. <br />5. Time may vary due to rebid (if needed) or if legal issues arise. <br />6. Construction time could change due to unknown excavation issues and abnormal weather issues. <br />Exhibit 5 of the Historic Rogers Road Area Sanitary Sewer <br />Extension Preliminary Engineering and Field Investigations <br />Report - March 2015 (prepared by URS for OWASA) <br />