Browse
Search
Agenda - 05-19-2015 - 6i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-19-2015 - Regular Mtg.
>
Agenda - 05-19-2015 - 6i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 9:54:43 AM
Creation date
5/15/2015 9:01:51 AM
Metadata
Fields
Template:
BOCC
Date
5/19/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6i
Document Relationships
2015-218 Interlocal Agreement - OWASA Relating to Design of a Sewer Main Extension Project in the Rogers Road Area
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2015
Minutes 05-19-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />WHEREAS, OWASA and the County wish to cooperate to assure the successful <br />completion of this Project; <br />NOW, THEREFORE, the parties agree as follows: <br />1. Purpose. The purpose of this Agreement is to establish the financial and other <br />responsibilities of the parties for design of the sewer main extension project to serve the Project <br />Area, as represented in the map included in Exhibit A, showing the Project area. <br />2. Design Phase. <br />a. At the conclusion of the Preliminary Engineering Phase for the Project, as <br />that is defined in that previous Agreement between the parties dated , the <br />County shall determine and approve the service area, scope, and design parameters for the <br />Project, including the identification of each parcel of real estate (by PIN number) which County <br />determines shall be served or otherwise benefitted by the Project, all subject to and in accordance <br />with OWASA's usual design standards and system requirements. <br />b. Using its own employees, and such engineers, consultants and sub- <br />consultants as it deems appropriate, and in consultation with the County, OWASA shall <br />undertake to complete final design and surveying and the County will pay the costs of that work, <br />including the costs of OWASA's employees' work, all as necessary to complete the Project so as <br />to allow for its design in accord with this agreement. <br />During the design phase and prior to commencement of construction, the <br />County shall obtain all easements, permits, privileges and assurances necessary for the <br />construction and operation of the sewer system; such easements shall conform with the exclusive <br />easements customarily required by OWASA for construction of such projects, and shall be <br />assignable without the consent of the underlying fee owner to OWASA. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.