Browse
Search
Agenda - 05-19-2015 - 6d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 05-19-2015 - Regular Mtg.
>
Agenda - 05-19-2015 - 6d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 3:14:35 PM
Creation date
5/15/2015 8:58:07 AM
Metadata
Fields
Template:
BOCC
Date
5/19/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6d
Document Relationships
Minutes 05-19-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />rates in newer housing (defined as units constructed in the most recent 10 -year period) and <br />also disaggregated by the number of bedrooms contained in each unit. <br />Previous numbers used for SAPFO and Certificate of Adequate Public Schools (CAPS) <br />purposes were from the 2007 Impact Fee Study which developed student generation rates <br />based on the entire housing stock in each school district since impact fees must be based on <br />the entire housing stock. New rates from the 2014 Student Generation Rates for Orange <br />County Schools and Chapel Hill- Canrboro School District Report are based on an analysis of <br />recently built units from January 1, 2004 to December 31, 2013. <br />The SAPFOTAC reviewed and discussed the most recent student generation rate analysis <br />included in the 2014 TischlerBise report. It is recommended the BOCC and other governing <br />boards accept the new rates as reported in Attachment II.E.1on page 44 of the report as the <br />standard for the SAPFO and CAPS system. Once the report is adopted by the BOCC, these <br />new rates will become the standard for the SAPFO and CAPS system. <br />FINANCIAL IMPACT: Based on <br />capital facility construction needs a <br />New Elementary #12 <br />New Middle School #5 <br />Based on 10 -year student growth <br />needs as follows: <br />Expanded High School <br />10 -year student growth projections, CHCCS has projected <br />s follows- <br />2023-2024 <br />2023 -2024 <br />projections, OCS has projected capital facility construction <br />2022 -2023 <br />Section 7 of the Schools Adequate Public Facilities Memorandum of Understanding (MOU) <br />states, "Orange County will use its best efforts to provide the funding to carry out the Capital <br />Improvement Plan referenced in Section 1 above." <br />RECOMMENDATION(S): The Manager recommends the Board approve the 2015 SAPFOTAC <br />Annual Report and certify those aspects of the Report detailed in the summary table above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.