Orange County NC Website
18 <br />1 <br />2 <br />i.)Mountains to Sea Trail (MTST) (Page 53) <br />3 <br />The NC Mountains-to-Sea Trail, or MST, is a part of the State parks system and would <br />4 <br />traverse portions of Orange County.This project reflects construction of segments of <br />5 <br />the Mountains-to-Sea Trail during 2019 and beyond, as lands are acquired and <br />6 <br />segments connected. A master plan process has been initiated by State Parks, and will <br />7 <br />continue into summer 2015.A master plan is needed prior to anytrail construction to <br />8 <br />specifically identify the trail location and develop a plan for implementation and <br />9 <br />operation.Lands would be acquired (voluntarily) using the Lands Legacy Program <br />10 <br />Funds. (Note: The Seven Mile Creek Natural Area portion of Upper EnoNature <br />11 <br />Preserve includes a segment of the MST). <br />12 <br />13 <br />j.)New Hope Preserve/Hollow Rock Public Access Area(Page 54) <br />14 <br />The New Hope Preserve, which includes the Hollow Rock Natural Area, will feature <br />15 <br />hiking trails and environmental education/signage throughout a 72acre site owned by <br />16 <br />Orange County, Durham County and the Town of Chapel Hill. These costs are for <br />17 <br />planned site facilities (parking, driveway, trails and bridges, kiosks and other low-impact <br />18 <br />amenities) that would be built in three phases. Durham County willlikely contribute 50% <br />19 <br />of the cost of these facilities and amenities (pending an interlocal agreement to this <br />20 <br />effect). Archaeological survey work is underway (via a $15,000 grant and Orange <br />21 <br />County $10,000 match), and additional grant funding of $200,000 for the first phase of <br />22 <br />facilities has been awarded (with a local match of $25,000 from Durham and Orange <br />23 <br />allocated in prior years). Phase I facilities (trails) are underway. Phase II facilities would <br />24 <br />be constructed in Year 2, and Phase III (if Pickett Roadis closed) would be beyond Year <br />25 <br />5. Note: The draft MOU between the local governments will be presented for approval <br />26 <br />this spring prior to Year 2 construction. <br />27 <br />28 <br />k.)Northeast District Park(Page 55) <br />29 <br />Northeast District Park is a142 acre site acquired in late 2007 as the future district park <br />30 <br />for northern Orange County. The site was acquired with the potential for appropriate co- <br />31 <br />located facilities in mind. A Preliminary Concept Plan was prepared by staff that <br />32 <br />identifies the most likely locations for different types of park activities, including a <br />33 <br />potential solid waste convenience center and possible emergency services substation <br />34 <br />and cellular tower within the park. No park concept plan has been developed, but is <br />35 <br />anticipated for 2015to 2016. The property is currently land-banked and leased to a local <br />36 <br />farmer for cattle grazing pending future construction. Some small-scale site <br />37 <br />management duties are projected for Year 1. <br />38 <br />39 <br />l.)RiverPark, Phase II-(Page 56) <br />40 <br />Phase II of RiverPark, located behind the Courthouse and County East Campus, would <br />41 <br />include a performance shell for events, benches, and a small exhibit on the <br />42 <br />Occonneechee tribe. Additional facilities may be needed related to the Town of <br />43 <br />Hillsborough pedestrian improvements along Churton Street. <br />44 <br />45 <br />m.)Twin Creeks Park,Phase II (Page 57) <br />46 <br />Twin Creeks (Moniese Nomp) Park is located along Old NC 86 north of Carrboro and <br />47 <br />connects to Morris Grove Elementary School (school was part of the overall site). Phase <br />48 <br />I of the park (Jones Creek Greenway) was completed in 2011. Funding for Phase II of <br />49 <br />this park is projected for Year 6, with design and pre-construction in Year 5. However, <br />50 <br />an opportunity to construct the main entry road may exist in conjunction with shared <br /> <br />