Browse
Search
2015-198-E AMS - Robert Winston Carr, Inc. for Sportsplex Mezzanine Design $87,000
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-198-E AMS - Robert Winston Carr, Inc. for Sportsplex Mezzanine Design $87,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 10:44:59 AM
Creation date
5/6/2015 2:51:27 PM
Metadata
Fields
Template:
BOCC
Date
5/6/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-198-E AMS - Robert Winston Carr, Inc. for Sportsplex Mezzanine Design
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:4C996037-012A-4978-866D-FBEA2F02CC51 <br /> r <br /> K <br /> .... �.! `,_�''�,psi s. /�sr�.�, �" �''✓l. <br /> � � � � eddie�capitalh� ingco 8 tans �� <br /> About Us <br /> Accurate and timely cost Identification Is the single most important aspect of <br /> the design and construction process,Cost Identification and controls provide <br /> the ultimate success or failure of your building,plogramlProm prelirrdnary <br /> planning through actual construction,dontrol fis"critical,In order to gain control, <br /> you MUST have accurate and complete costing inforfnation. <br /> At"Capital Bwlding Consultants"w pert supply that information foryou Our <br /> staff supports you with Professlgi GUldence ensuring you of the best <br /> possible costdata available We�hO f the construetion,estimating expertise - <br /> j and bus"iness savvy to bring all aspects of Cost identification and control Into <br /> � ¢ complete locus for you, k <br /> s � First and foremost,we strlve,t6�4 tii&ur specific needs,As each project,Is, <br /> �� unlqua ere your needs;o"r Ml�c�s can be tailored fo meet;your individual " <br /> requirements <br /> /t / Since 1881,"Cq ital Building 066W[WnW has,successfully assisted business; <br /> �r 7 and ggvammentVrofessianalswith cost corifro)s.Let us show you how our- <br /> services Wit enhance yourcapltel planning and'cost control strategy.Cali <br /> P' Capital Building Consutants at(338j 7751903 today, <br /> / v <br /> / Services <br /> �r Preliminary Budgets&Feasibility Studies <br /> Conceptual cost evaluation of the design intent based on the proposed usage <br /> and budget. <br /> f. Schematic Design Cost Estimate(SD), <br /> This effort Is typically based on the deslgnar's single;line concept drawings <br /> along with basic scope speiiificatiooi or.fitent:Ttte,esdmate is fumished in a <br /> "UCI•Systems Format"categorizing fades and materials into specific building <br /> systems With.ldentifiable cost <br /> r <br /> Design Development Cost EstimateDD) <br /> f This is based on the designers pr4JOttl6h drawings(norrmally 40/60% <br /> �Q complete)and is an expanded et ife 'cost estimate furnished in"AAA <br /> r <br /> DIVIslgnal"Format"tDiv.Nas 1 tttru�6j,You'll see a detailed unit materiel and <br /> labor cost"estimatoes lrneepretOU01 bf,the dompiete design Intent. <br /> Construction Document Cost Estimate(CD) <br /> 1 This is adatailed"nuts&bolts' estimate fumished In"AiA Divisional Format" <br /> (Diu Nos.1 thru 16).It oullines all material,labor and sub-contractor cost <br /> d accounting including general`conditions; dprojected fees.The estimate is <br /> r based on 901009b Completed designcuments.Providing a final check,to <br /> ensure that bid day Is productive 6 an exercise in frustration! . <br /> a A u <br />
The URL can be used to link to this page
Your browser does not support the video tag.