Orange County NC Website
DocuSign Envelope ID:4C996037-012A-4978-866D-FBEA2F02CC51 <br /> RESUME <br /> STEWART <br /> EDUCATION J. Craig Fisher,'PE <br /> Masters of Civil Engineering, Associate Vice President/Manager of Structural Engineering <br /> North Carolina State <br /> University, Craig is responsible for the overall management of Structural Engineering to <br /> Raleigh, NC, 1995 include oversight and management of projects, client development and retention, <br /> Bachelor of Science, financial profitability, personnel and general administrative management. The <br /> Civil Engineering, North management and supervision of the staff includes setting overall goals and <br /> Carolina State University, objectives. Basic operations include determining the appropriate staff mix and <br /> Raleigh, NC, 1994 developing processes to screen, Interview, hire, train, and maintain the technical <br /> competency of Structural Engineering staff.The supervision also includes <br /> REGISTRATION monitoring staff performance, delegating responsibilities to staff, and mentoring <br /> North Carolina #24417 staff. Management of the Quality Assurance and Quality Control procedures are <br /> Virginia #0402050282 also supervised by Craig. Overall supervision of the Standards Committee, <br /> Tennessee#115886 Revit/CAD Committee, and Training program help ensure that Quality Assurance <br /> Maryland#0041893 and Control procedures are followed. Craig also serves as Project Manager on <br /> West Virginia #19447 larger and more complex projects including institutional, educational, and health <br /> Arizona #54254 care buildings. Craig is located in the Raleigh office. <br /> SELECTED EXPERIENCE <br /> UNC Chapel Hill Brauer Hall Renovation,Chapel Hili, NC -Craig served as Structural <br /> Project Manager for the renovation of 104,000 square feet of the facility, Including the <br /> ground, first, third and fourth floor. Structural work for the project Included the infill of <br /> several floor openings at various floors;The large floor openings at the first floor and fourth <br /> floor lobby spaces were filled in to create two new bathrooms on each of these floors. <br /> NC State University Jordan Hall Addition,Raleigh,INC-Craig was the Project Manager/ <br /> Engineer of Record for the$12 million,42,000 square foot project,which involved the <br /> addition of classrooms, lecture halls, distance learning centers and classroom labs for the <br /> College of Natural Resources and Physical and Mathematical Sciences. Basement-level parking <br /> was also added, requiring a multi-story pedestrian bridge, connecting the new addition to the <br /> existing building. <br /> Rex Cancer Hospital Additions and Renovations,Raleigh,NC-Craig is the Structural <br /> Project Manager for this project, which consists of includes the 84,000 square foot addition <br /> and partial renovation to the existing cancer hospital.The addition consists of eight stories <br /> (Including lower levels) and is designed to support two future additional stories,The project <br /> also Includes a new central energy plant to house three new standby generators separated <br /> from a battery of six boilers by a corridor. <br /> North Carolina Court of Appeals Renovation, Raleigh, INC-Craig served as Structural <br /> Project Manager for this extensive renovation to the NC Court of Appeals which included <br /> major structural alterations.A monumental stair and new elevator were added. Roof skylight <br /> was created, and the existing exterior stairs up to the roof were extended. Existing floor <br /> openings were In-filled, new openings were created for the mechanical improvements,and <br /> dunnage was provided for new rooftop mechanical equipment. A dumbwaiter was also added. <br />