Orange County NC Website
DocuSign Envelope ID:4C996037-012A-4978-866D-FBEA2F02CC51 <br /> R I INC. <br /> A. Past relevant project experience: <br /> The following listing of completed projects include mezzanine and/or new floor <br /> constructions within existing buildings. They include... <br /> 1) Restoration / Renovation to... 1916 / Durham County Court House <br /> 2) Addition of... Overlook Mezzanine to... former Department Store for... Main <br /> Bank Room Offices, Sun Trust Bank, Durham <br /> 3) Extension of Second Floor over 2 % story Lobby @... Math & Science <br /> Classroom Building / Durham High School <br /> 4) Three non combustible Floors Constructed within the fire gutted exterior <br /> masonry shell walls @ Phi Gamma Delta, Fraternity / UNC <br /> Each of the above projects had unique situations and circumstances. For this <br /> submittal we have singled out the 1916 / Durham County Court House as a good <br /> example of past experience that relates to the Sportsplex Mezz, project. A detailed <br /> project description w/ illustrations is contained later in this booklet under the <br /> heading Illustrations.... Note: We have not had completed work within the last <br /> seven years that includes Mezzanine construction within an existing building. <br /> Regardless... Edgar Carr was the project architect for each of the above projects <br /> and Willy Stewart, PE, founder of Stewart Engineering was the structural engineer <br /> for the 1916 / Durham County Court House project where two complete new floors <br /> were added where previous floor constructions did not exist. A sampling of the <br /> construction drawings for this work is contained later in this submittal. <br /> B. Scope of anticipated services: <br /> I feel certain I am not stating new news but... the Mezzanine Project is predicated <br /> on a very tight time line. Re: Start planning / design work immediately following A/E <br /> selection and contract negotiation w/acceptable bids received summer 2015; <br /> construction contract awarded w/final construction completion fall /winter 2015. <br /> This is a tall order not to mention doing so while maintaining safe /occupied use of <br /> the aquatic area during construction. see * below) <br /> We have successfully faced similar situations before, in fact our most recent <br /> completed project... Renovations to... Phi Delta Theta Fraternity/ UNC. The <br /> project scope called for gutting major portions of the existing structure including six <br /> load bearing masonry walls removed. Construction began May 12, 2014 w/ <br /> occupancy achieved August 15, 2014. No academic semester time was lost! <br /> General Contractor was Romeo-Guest Associates, Durham. Jim Robbins, <br /> President (919-683-1701) Lead Client Contact: Tom C. Kerns, President, Beta <br /> Chapter Board, Phi Delta Theta Fraternity, Chapel Hill. (919-960-5475) <br />