Orange County NC Website
NEW ADMIN/ <br />_ ___ Y <br />BUILDING <br />SCI E <br />RENOVATIOIN <br />_ 1r <br />t` F �Poph, r ` <br />I <br />_ IIr1[flrf•F_wrr _I!r <br />RECOMMENDATIONS <br />• Renovate existing building. <br />• Construct small addition that provides new location for <br />administration suite and provides secure main entrance <br />CULBRETH MIDDLE SCHOOL <br />CURRENT CONDITIONS: 12 <br />• Operating slightly over capacity <br />• No mobile units <br />• Six science classroom addition under construction <br />• Additional staff support space needed <br />• Location of administration suite presents security concerns <br />• Modular partition walls between classrooms allow sound <br />transfer between classes <br />• Water infiltration issues into the lower level Band room <br />• Major damage to EIFS on exterior of building <br />Year Built: 1968 <br />Additions: 1977, 1988, 1989, 1997, 1999, 2001 <br />Mimi Last Renovation: 2013 <br />Area: 108,058 sf <br />Acres: 3S.4 <br />Student Capacity (per SAPFO): 670 Students <br />2013 ADM: 696 Students <br />Construction: Load - bearing CMU wall construction <br />ii® coney redioof a,chfle k <br />ARCHITECTS � �oRa <br />