Orange County NC Website
RECOMMENDATIONS <br />• Eliminates life safety issues in Building 100 by deconstruction <br />and building new academic wing <br />• Provide a new administration suite main entrance <br />• Moves queuing off of the road <br />• Connects all existing building internally <br />• Renovate all existing buildings <br />• Increase capacity by 52 seats. <br />MOSELEYARCHTECTS <br />+4 <br />CARRBORO ELEMENTARY SCHOOL <br />CURRENT CONDITIONS: 10 <br />• One mobile unit on -site <br />• 100 classroom wing has dead -end corridors and does not meet <br />the current NC State Building Code <br />• Administration area, cafeteria, kitchen and staff support spaces <br />are too small <br />• Program deficiencies - art room and 5 smaller classroom spaces <br />• Existing queueing for parent drop -off occurs on Shelton Street <br />• Stacking traffic onto the public right of way is a safety concern <br />• Aging mechanical system <br />• Campus -style layout lacking connection from main building to <br />the multipurpose building <br />• Modular walls between classrooms causing noise transfer <br />between classrooms <br />Year Built: 1957 <br />Additions: 1964, 1989 <br />Last Renovation: 2011 <br />Area: 61,562 sf <br />Acres: 17.7 <br />Student Capacity (per SAPFO): 533 Students <br />2013 ADM: 468 Students <br />Construction: Precast concrete frame with brick infill and <br />built -up roof <br />I-iAI'EL HILL - <br />ARRBORO <br />.1 �r� 5C. 11 0 C LS <br />