Browse
Search
Agenda - 04-28-2015 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 04-28-2015 - Work Session
>
Agenda - 04-28-2015 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2015 10:59:29 AM
Creation date
4/24/2015 11:07:37 AM
Metadata
Fields
Template:
BOCC
Date
4/28/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 04-28-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHCCS Facilities Assessment <br />Construction Phasing/ Temporary Facilities Preliminary Analysis 1 <br />PHASE I CONSTRUCTION LIST <br />School Name <br />Scope of Work <br />Est. Cost <br />• School would be partially occupied and functioning <br />during construction activities. Some student <br />relocations to offsite classrooms would be required. <br />• Relocate bus drop off and provide limited temporary <br />CARRBORO ELEMENTARY <br />parking areas. <br />$50,000 <br />• Provide temporary measures to separate <br />construction areas from public access to building. <br />• Phase work in existing buildings to unoccupied times. <br />• School would be fully occupied and functional during <br />construction activities. <br />• Provide temporary parking adjacent to existing <br />CHAPEL HILL HIGH SCHOOL <br />transportation building. <br />$2.1M <br />• Provide temporary mobile classrooms to replace <br />spaces to be deconstructed. <br />• Phase work in existing buildings to unoccupied times. <br />• School would be occupied and functioning during <br />CULBRETH MIDDLE <br />construction activities. <br />$0 <br />• Phase work in existing buildings to unoccupied times. <br />• School would be occupied and functioning during <br />construction activities. <br />• Some student relocations to offsite permanent <br />EPHESUS ELEMENTARY <br />classrooms would be required during major interior <br />$0 <br />renovation phase. <br />• Phase work in existing classroom wing to unoccupied <br />times. <br />• School would be partially occupied by grades K -2 and <br />functioning during construction activities. Relocation <br />of grades 3 -5 during to offsite permanent classrooms <br />during construction would be required. <br />ESTES HILLS ELEMENTARY <br />• Provide temporary measures to separate <br />$0 <br />construction areas from public access to building. <br />• Phase work in existing buildings to unoccupied times. <br />3000 fkDU CENTER DRIVE, SUITE 211, MC7PRIS°VIILLE, NC 27560 919.840.O091 FAX 91984(100145 <br />M SLII v RCII iiTECTS.c;o M <br />
The URL can be used to link to this page
Your browser does not support the video tag.