Browse
Search
Agenda - 04-28-2015 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 04-28-2015 - Work Session
>
Agenda - 04-28-2015 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2015 10:59:29 AM
Creation date
4/24/2015 11:07:37 AM
Metadata
Fields
Template:
BOCC
Date
4/28/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes 04-28-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: 7 <br />Page 2 <br />Factors used to evaluate and formulate the scope of work: <br />■ Critical needs - code, life safety, etc. <br />■ Long range use of facility <br />■ Need for additional seats in geographic location and growth areas <br />■ History of past improvements at facilities <br />■ Safety and security concerns <br />PROS for Recommendations: <br />• Eliminates mobiles <br />• Increases student capacity <br />• Delays the need for the next new elementary school <br />• Extends the life of the older schools in the district <br />• Increase security <br />• Maintain existing buildings <br />GLENWOOD <br />• Provide small administrative addition <br />$1.70M <br />ELEMENTARY <br />• Provide secure main entrance & adequate administrative <br />space <br />• Deconstruct the existing Lincoln Center <br />LINCOLN <br />• Construct a building to house both Pre -K program & new <br />$15.99M <br />CENTER <br />central office <br />• Increase elementary capacity by 189 <br />• Renovate existing building <br />PHILLIPS <br />• Provide additional program space to meet space standards <br />$9.61M <br />MIDDLE <br />including increasing the admin suite to provide a secure <br />main entry <br />• Deconstruct the five classroom pod <br />• Renovate the existing buildings <br />SEAWELL <br />' Provide additional program space to meet space standards <br />$15.74M <br />ELEMENTARY <br />&replace deconstructed classrooms <br />• Increase capacity by 119 <br />Construction Phasing & Temp. Facilities Cost: $2.98M <br />Total Estimated Cost: $160.84M <br />Factors used to evaluate and formulate the scope of work: <br />■ Critical needs - code, life safety, etc. <br />■ Long range use of facility <br />■ Need for additional seats in geographic location and growth areas <br />■ History of past improvements at facilities <br />■ Safety and security concerns <br />PROS for Recommendations: <br />• Eliminates mobiles <br />• Increases student capacity <br />• Delays the need for the next new elementary school <br />• Extends the life of the older schools in the district <br />• Increase security <br />
The URL can be used to link to this page
Your browser does not support the video tag.