Orange County NC Website
OCS -- UNFUNDED PROJECTS NOT IN CIP <br />37 <br />Scope of Work <br />PRIORITY 1 -3 <br />ESTIMATED PROJECT COST <br />Location <br />LOW <br />HIGH <br />NEW DEDICATED OUTSIDE AIR UNIT <br />MECH -2 <br />$240,000 <br />$400,000 <br />GRADY BROWN <br />KITCHEN HOOD SUPPLY AIR HEAT <br />MECH -3 <br />$16,000.00 <br />$20,000.00 <br />GRADY BROWN <br />ENERGY MANAGEMENT SYSTEM <br />MECH -2 <br />$255,000 <br />$328,000 <br />HES <br />NEW 4 -PIPE SYSTEMS FOR GYM /CAFETERIA <br />MECH -2 <br />$217,800 <br />$254,100 <br />HES <br />NEW CHILLED WATER DISTRIBUTION PIPING <br />FOR GYM AND CAFETERIA <br />MECH -2 <br />$8,000 <br />$12,000 <br />HES <br />NEW CHILLERS <br />MECH -2 <br />$200,000 <br />$250,000 <br />HES <br />NEW DEDICATED OUTSIDE AIR UNITS <br />MECH -2 <br />$360,000 <br />$600,000 <br />HES <br />NEW FAN COIL UNITS <br />MECH -2 <br />$210,000 <br />$240,000 <br />HES <br />REPLACE CAFETERIA BOILER WITH NEW HW <br />BOILER WITH INCREASED CAPACITY FOR <br />GYM /CAFETERIA. ADD HW DISTRIBUTION <br />PIPING <br />MECH -2 <br />$150,000 <br />$250,000 <br />HES <br />ENERGY MANAGEMENT SYSTEM <br />MECH -2 <br />$52,500 <br />$67,500 <br />MAINT <br />NEW SPLIT SYSTEM HEAT PUMP <br />MECH -2 <br />$8,000 <br />$10,000 <br />MAINT <br />NEW GAS FIRED UNIT HEATERS <br />MECH -2 <br />$5,300 <br />$8,300 <br />MAINT <br />NEW WI <br />MECH -2 <br />$1,000 <br />$1,400 <br />MAINT <br />NEW GAS FURNACES WITH DUCT /AC COIL <br />MECH -2 <br />$10,000 <br />$12,000 <br />MAINT <br />NEW DOAS UNITS <br />MECH -2 <br />$30,000 <br />$40,000 <br />MAINT <br />ENERGY MANAGEMENT SYSTEM <br />MECH -2 <br />$350,600 <br />$450,800 <br />NEW HOPE <br />NEW BOILER <br />MECH -2 <br />$160,000 <br />$200,000 <br />NEW HOPE <br />NEW FAN COIL UNITS <br />MECH -2 <br />$220,500 <br />$252,000 <br />NEW HOPE <br />NEW DEDICATED OUTSIDE AIR UNIT <br />MECH -2 <br />$360,000 <br />$600,000 <br />NEW HOPE <br />NEW CHILLERS <br />MECH -3 <br />$400,000.00 <br />$500,000.00 <br />NEW HOPE <br />ENERGY MANAGEMENT SYSTEM <br />MECH -2 <br />$747,300 <br />$960,800 <br />OHS <br />NEW HOT WATER BOILER <br />MECH -2 <br />$80,000 <br />$100,000 <br />OHS <br />CONVERT /REPIPE EXISTING BOILER TO HOT <br />WATER <br />MECH -2 <br />$40,000 <br />$50,000 <br />OHS <br />NEW CHILLER <br />MECH -2 <br />$800,000 <br />$1,000,000 <br />OHS <br />NEW BASE MOUNTED PUMPS <br />MECH -2 <br />$192,000 <br />$224,000 <br />OHS <br />NEW AIR HANDLING /VENTILATION SYSTEM <br />MECH -2 <br />$4,270,200 <br />$5,124,250 <br />OHS <br />TEST AND BALANCE <br />MECH -2 <br />$213,500 <br />$320,300 <br />OHS <br />NEW DISHWASHER EXHAUST FAN AND <br />DUCTWORK <br />MECH -2 <br />$3,000 <br />$3,500 <br />OHS <br />REPLACE HVAC IN CONCESSION STANDS <br />MECH -2 <br />$2,500 <br />$3,000 <br />OHS <br />REPLACE HVAC IN KITCHEN <br />MECH -2 <br />$80,000 <br />$88,000 <br />OHS <br />NEW KITCHEN EXHAUST SYSTEM WITH <br />SUPPLY /FAN /DUCTWORK <br />MECH -3 <br />$16,000.00 <br />$20,000.00 <br />OHS <br />TEST AND BALANCE <br />MECH -2 <br />$6,400 <br />$8,000 <br />PARTNERSHIP <br />DEHUMIDIFIERS <br />MECH -2 <br />$5,000 <br />$6,000 <br />PARTNERSHIP <br />NEW HEAT PUMPS <br />MECH -3 <br />$14,000.00 <br />$16,000.00 <br />PARTNERSHIP <br />NEW SPLIT SYSTEM HEAT PUMPS <br />MECH -2 <br />$14,000 <br />$16,000 <br />PATHWAYS <br />UPGRADE EMERGENCY MANAGEMENT SYSTEM <br />MECH -3 <br />$213,250.00 <br />$298,500.00 <br />PATHWAYS <br />NEW BOILER <br />MECH -3 <br />$160,000.00 <br />$200,000.00 <br />PATHWAYS <br />UNFUNDED <br />