Orange County NC Website
OCS -- UNFUNDED PROJECTS NOT IN CIP <br />30 <br />UNFUNDED <br />ESTIMATED PROJECT COST <br />Scope of Work <br />PRIORITY 1 -3 <br />Location <br />LOW <br />HIGH <br />REMOVE CRUMBLING CHIMNEY ON THE BACK <br />OF THE BUILDING <br />C13I -2 <br />$1,500 <br />$2,000 <br />MAINT <br />REPAIR GUTTER, FASCIA, GRAVEL STOP AND <br />WOOD TRIM ISSUES <br />C13I -2 <br />$8,200 <br />$9,600 <br />MAINT <br />PROVIDE COMPLIANT HANDRAILS AT THE <br />LOADING DOCK AREA <br />C13I -2 <br />$1,000 <br />$1,500 <br />MAINT <br />ADD A TYPICAL ENGINEERED BUILDING <br />ACCESSIBLE DOOR <br />C13I -2 <br />$2,500 <br />$3,000 <br />MAINT <br />ADD A NEW EXIT DOOR FROM THE REAR OF <br />THE BUILDING <br />C13I -2 <br />$3,800 <br />$4,500 <br />MAINT <br />PROVIDE A NON -SLIP EPDXY SURFACE IN THE <br />SHOP BAY AREA <br />C13I -2 <br />$10,000 <br />$12,500 <br />MAINT <br />PROVIDE A SHIP'S LADDER TO THE MEZZANINE <br />C13I -2 <br />$2,500 <br />$3,000 <br />MAINT <br />PROVIDE AN ISOLATED CHEMICAL STORAGE <br />AREA OFF THE SHOP BAY AREA <br />C13I -2 <br />$5,000 <br />$6,500 <br />MAINT <br />NEW SENSOR FAUCETS <br />C13I -2 <br />$2,750 <br />$3,750 <br />MAINT <br />NEW WATER CLOSETS AND SENSOR FLUSH <br />VALVES <br />C13I -2 <br />$5,500 <br />$6,500 <br />MAINT <br />REPAIR LOADING DOCK WALLS <br />C13I -2 <br />$18,000 <br />$20,000 <br />MAINT <br />REPAIR SAGGING SOFFITS <br />C13I -2 <br />$3,000 <br />$4,000 <br />NEW HOPE <br />300 WING -- REPLACE RUSTED MECHANICAL <br />DOOR <br />C13I -2 <br />$1,500 <br />$2,500 <br />NEW HOPE <br />REPAIR DAMAGED CERAMIC TILE FLOORING <br />C13I -2 <br />$5,000 <br />$7,500 <br />NEW HOPE <br />NEW LAVATORY SENSOR FAUCETS <br />C13I -2 <br />$13,750 <br />$18,750 <br />NEW HOPE <br />NEW WATER CLOSETS WITH SENSOR FV <br />C13I -2 <br />$55,000 <br />$65,000 <br />NEW HOPE <br />NEW URINALS WITH SENSOR FLUSH VALVE <br />C13I -2 <br />$15,400 <br />$18,200 <br />NEW HOPE <br />REPLACE SEALANT BETWEEN BRICK VENEER <br />AND REINFORCED CONCRETE <br />C13I -2 <br />$35,000 <br />$44,000 <br />OHS <br />CLEAN AND PATCH THE AREAS OF REINFORCED <br />REBAR ON ALL OF THE REINFORCED CONCRETE <br />FRAMEWORK <br />C13I -2 <br />$30,000 <br />$40,000 <br />OHS <br />INJECT EPDXY INTO THE AREAS OF REINFORCED <br />CONCRETE WITH CRACKS OR SHEER <br />CONDITIONS AT COLUMN /BEAM <br />INTERSECTIONS <br />C13I -2 <br />$15,000 <br />$20,000 <br />OHS <br />INSTALL STREE RELIEVING CONTROL JOINS IN <br />ALL BRICK VENERR COUMN CLADDING ON 400 <br />WING AND SMALL GYM <br />C13I -2 <br />$16,000 <br />$20,000 <br />OHS <br />REPLACE REAR SOFFIT AT THE LOBBY OF THE <br />LARGE GYM <br />C13I -2 <br />$2,500 <br />$4,000 <br />OHS <br />REPAIR THE PEELING PAINT HIGH ON THE SIDE <br />OF THE MAIN ENTRANCE BUILDING <br />C13I -2 <br />$3,000 <br />$4,500 <br />OHS <br />CLEAN AND PAINT EXPOSED CONDUIT OVER <br />MAIN ENTRANCE <br />I C13I -2 <br />1 $1,5001 <br />$2,5001 <br />OHS <br />UNFUNDED <br />