OCS -- UNFUNDED PROJECTS NOT IN CIP
<br />29
<br />Scope of Work
<br />PRIORITY 1 -3
<br />ESTIMATED PROJECT COST
<br />Location
<br />LOW
<br />HIGH
<br />REPLACE BROKEN /MISSING CONDENSATE
<br />PIPING AT EXTERIOR OF CLASSROOMS
<br />C13I -2
<br />$1,500
<br />$2,000
<br />CWS
<br />REPAIR DAMAGED FASCIA
<br />C13I -2
<br />$4,800
<br />$5,600
<br />CWS
<br />REPLACE 2 X 4 CEILING TILES WITH 2 X 2 TILES
<br />C13I -2
<br />$150,000
<br />$175,000
<br />CWS
<br />PROVIDE PARTITION BETWEEN ART STORAGE
<br />AND MUSIC STORAGE
<br />C13I -2
<br />$2,000
<br />$2,500
<br />CWS
<br />PROVIDE URINAL SCREENS
<br />C13I -2
<br />$3,500
<br />$4,500
<br />CWS
<br />REPAIR CERAMIC TILE AND BASE
<br />C13I -2
<br />$4,900
<br />$5,600
<br />CWS
<br />ADDRESS PAINT ISSUES IN LOCKER ROOMS
<br />C13I -2
<br />$5,000
<br />$6,000
<br />CWS
<br />NEW SENSOR FAUCETS FOR LAVATORIES
<br />C13I -2
<br />$20,350
<br />$27,750
<br />CWs
<br />NEW SENSOR FLUSH VALVES FOR WC AND
<br />URINALS
<br />C13I -2
<br />$40,800
<br />$54,400
<br />Cws
<br />NEW HOT WATER SYSTEMS FOR BATHROOM
<br />GROUPS
<br />C13I -2
<br />$50,000
<br />$75,000
<br />Cws
<br />REPLACE THE ACT CEILING IN THE KITCHEN
<br />C13I -2
<br />$10,800
<br />$14,500
<br />EFLAND
<br />NEW LAVATORIES WITH SENSOR FAUCET
<br />C13I -2
<br />$32,550
<br />$38,750
<br />EFLAND
<br />NEW LOW FLOW WATER CLOSETS AND SENSOR
<br />FV
<br />C13I -2
<br />$33,000
<br />$39,000
<br />EFLAND
<br />NEW LOW FLOW URIALS WITH SENSOR FLUSH
<br />VALVE
<br />C13I -2
<br />$9,900
<br />$11,700
<br />EFLAND
<br />NEW CLASSROOM WCS WITH SENSOR FLUSH
<br />VALVE
<br />C13I -2
<br />$17,600
<br />$20,800
<br />EFLAND
<br />NEW SENSOR OPERATED FLUSH VALVES
<br />C13I -2
<br />$34,200
<br />$45,600
<br />EFLAND
<br />NEW FENCING AND CONCRETE PAD AT
<br />DUMPSTERS
<br />C13I -2
<br />$10,000
<br />$15,000
<br />EFLAND
<br />NEW INLET AND PIPING FOR COURTYARD
<br />C13I -2
<br />$2,000
<br />$3,000
<br />EFLAND
<br />REPAIR SAGGING FASCIA AND SOFFIT
<br />C13I -2
<br />$1,500
<br />$2,100
<br />GRADY BROWN
<br />REPAIR /REPLACE RUSTED FIXTURES AND LENS
<br />COVERS
<br />C13I -2
<br />$2,400
<br />$3,200
<br />GRADY BROWN
<br />REPLACE DAMAGED OR STAINED CEILINGS
<br />C13I -2
<br />$1,600
<br />$2,250
<br />GRADY BROWN
<br />REPAIR FLOORING ISSUES
<br />C13I -2
<br />$4,200
<br />$5,600
<br />GRADY BROWN
<br />REPLACE CASEWORK AND SINKS
<br />C13I -2
<br />$6,000
<br />$7,000
<br />GRADY BROWN
<br />NEW LAVATORY FAUCET SENSORS
<br />C13I -2
<br />$20,350
<br />$27,750
<br />GRADY BROWN
<br />BUILDING 100 -- REPAIR SEALANT ISSUES
<br />C13I -2
<br />$8,600
<br />$11,000
<br />HES
<br />BUILDING 400 - REGLAZE WINDOWS
<br />C13I -2
<br />$5,000
<br />$7,000
<br />HES
<br />UPGRADES TO GROUP TOILET ROOMS
<br />C13I -2
<br />$17,000
<br />$24,000
<br />HES
<br />NEW DOMESTIC HOT WATER SYSTEM
<br />C13I -2
<br />$22,000
<br />$28,000
<br />HES
<br />NEW LAVATORIES WITH SENSOR FAUCET
<br />C13I -2
<br />$47,250
<br />$56,250
<br />HES
<br />NEW WATER CLOSETS WITH SENSOR FV
<br />C13I -2
<br />$53,900
<br />$63,700
<br />HES
<br />NEW URINALS WITH SENSOR FLUSH VALVE
<br />C13I -2
<br />$13,200
<br />$15,600
<br />HES
<br />NEW LAVATORY (KITCHEN)
<br />C13I -2
<br />$2,900
<br />$3,300
<br />HES
<br />ADD NEW DRAIN INLET AND STORM PIPIKNG
<br />AT WEST END OF BUILDING
<br />C13I -2
<br />$2,5001
<br />$3,5001
<br />HES
<br />NEW DUMPSTER ENCLOSURES AND GATES
<br />C13I -2
<br />$10,0001
<br />$12,0001
<br />HES
<br />UNFUNDED
<br />
|