OCS -- UNFUNDED PROJECTS NOT IN CIP
<br />27
<br />Scope of Work
<br />PRIORITY 1 -3
<br />ESTIMATED PROJECT COST
<br />Location
<br />LOW
<br />HIGH
<br />REPLACE 3- COMPARTMENT POT WASH SINK
<br />CBI -1
<br />$4,700
<br />$6,500
<br />NEW HOPE
<br />REPLACE DAMAGED RAILINGS
<br />CBI -1
<br />$2,000
<br />$3,000
<br />NEW HOPE
<br />ADD WORK TABLES AND PREP SINKS
<br />CBI -1
<br />$7,500
<br />$9,000
<br />OHS
<br />NEW TROUGH DRAIN (KITCHEN)
<br />CBI -1
<br />$8,000
<br />$10,000
<br />OHS
<br />REPAIR DAMAGED STAIR TREADS AND
<br />HANDRAILS
<br />CBI -1
<br />$10,000
<br />$12,500
<br />OHS
<br />REPLACE FLOOR DRAIN AT STEAMER AND
<br />BRAISER
<br />CBI -1
<br />$2,000
<br />$2,500
<br />OHS
<br />ADD A FLOOR SINK BEHIND COMBO -OVEN AND
<br />STEAMER
<br />CBI -1
<br />$1,500
<br />$2,500
<br />PATHWAYS
<br />NEW FLOOR SINK (KITCHEN)
<br />CBI -1
<br />$1,750
<br />$2,250
<br />PATHWAYS
<br />ADD NEW 60 QT MIXER
<br />FS -1
<br />$8,000
<br />$10,000
<br />CWS
<br />REPLACE COLD STORAGE UNIT
<br />FS -1
<br />$40,000
<br />$50,000
<br />CWS
<br />REPLACE STEAMER
<br />FS -1
<br />$30,000
<br />$35,000
<br />CWS
<br />REPLACE COLD STORAGE ASSEMBLY
<br />FS -1
<br />$65,000
<br />$70,000
<br />EFLAND
<br />ADD AIR CURTAIN ON RECEIVING UNIT
<br />FS -1
<br />$1,600
<br />$2,000
<br />GRADY BROWN
<br />REPLACE COLD STORAGE UNIT
<br />FS -1
<br />$62,000
<br />$75,000
<br />GRADY BROWN
<br />REPLACE FOOD SLICER
<br />FS -1
<br />$3,300
<br />$4,500
<br />GRADY BROWN
<br />REPLACE COLD STORAGE UNIT
<br />FS -1
<br />$40,000
<br />$50,000
<br />OHS
<br />REPAIR PIPE INSULATION
<br />C13I -2
<br />$15,000
<br />$22,500
<br />CP
<br />SENSOR FAUCETS
<br />C13I -2
<br />$2,200
<br />$3,000
<br />ADMIN ANNEX
<br />INSTALL CULVERT UNDER ENTRANCE FROM
<br />NEW HOPE CHURCH ROAD
<br />C13I -2
<br />$12,000
<br />$15,000
<br />ADMIN ANNEX
<br />REPLACE ALL COMPROMISED GLASS IN
<br />STOREFRONT AT MAIN ENTRANCE
<br />C13I -2
<br />$70,000
<br />$80,000
<br />ALS
<br />REPAIR AND REPAINT LINTELS
<br />C13I -2
<br />$7,500
<br />$10,000
<br />ALS
<br />REPAIR DAMAGED OR SHEERED BRICK
<br />CONDITIONS
<br />C13I -2
<br />$5,200
<br />$6,400
<br />ALS
<br />SOFFIT REPAIRS
<br />C13I -2
<br />$1,000
<br />$1,500
<br />ALS
<br />REPAIR ALL VCT AND RUBBER COVE BASE
<br />ISSUES
<br />C13I -2
<br />$8,500
<br />$10,000
<br />ALS
<br />PROVIDE ACOUSTICAL TREATMENT IN
<br />AUDITORIUM
<br />C13I -2
<br />$25,000
<br />$32,000
<br />ALS
<br />PROVIDE RAMP AT CAFETERIA STAGE
<br />C13I -2
<br />$1,000
<br />$1,500
<br />ALS
<br />RENOVATE 6TH GRADE CLASSROOM WING
<br />C13I -2
<br />$90,000
<br />$110,000
<br />ALS
<br />NEW SENSOR FAUCETS FOR LAVATORIES
<br />C13I -2
<br />$27,500
<br />$37,500
<br />ALS
<br />NEW LOW FLOW WATER CLOSETS WITH
<br />SENSOR FV
<br />C13I -2
<br />$48,400
<br />$57,200
<br />ALS
<br />NEW LOW FLOW URINALS WITH SENSOR FLUSH
<br />VALVE
<br />C13I -2
<br />$19,800
<br />$23,400
<br />ALS
<br />REPLACE 2 X 4 CEILING TILES AND GRID WITH 2
<br />X 2 CEILING TILES AND GRID
<br />C13I -2
<br />$15,500
<br />$17,500
<br />BOE
<br />SENSOR FAUCETS
<br />C13I -2
<br />$3,300
<br />$4,500
<br />BOE
<br />NEW WATER CLOSETS AND SENSOR FLUSH
<br />VALVES
<br />C13I -2
<br />$6,600
<br />$7,800
<br />BOE
<br />UNFUNDED
<br />
|