Orange County NC Website
FRANK PORTER GRAHAM ELEMENTARY <br />CURRENT CONDITIONS: 15 <br />• Magnet Spanish dual - language school <br />• Two mobile units on -site <br />• Kitchen, dining, & staff support areas are too small <br />• Existing reception area is in a large open lobby that is not secure <br />• Water infilitration issues in Building 5 <br />• Campus -style layout <br />• Aging mechanical system <br />Year Built: 1969 <br />Additions: 1977, 1989 <br />Last Renovation: 2012 <br />Area: 68,513sf <br />Acres: 9.8 <br />Student Capacity (per SAPFO): 538 Students <br />2013 ADM: 491 Students <br />Construction: load bearing CMU walls with brick veneer; <br />built -up roof over a poured- gypsum deck & pre -cast exterior wall <br />construction <br />RECOMMENDATIONS <br />• Deconstruct existing administration building & construct <br />addition for new administration /dining /kitchen space to meet <br />space standards. <br />• Provide more prominent front door and secure main entrance <br />• Renovate existing buildings. <br />rvSt _'F_L_L '�ARCHITECTS <br />Ir- <br />_ Alk <br />LL HILL - <br />ARRBOI,O <br />�� i I C G 1I COL - <br />