Orange County NC Website
RECOMMENDATIONS <br />• Renovate & reorganize the layout of the main building <br />• Relocate the administration suite to the street front & provide <br />a new secure, main entry <br />• Provide additional program space to eliminate mobiles & bring <br />school up the space standards <br />• Increase capacity by 137. <br />MOSELEYARCHTECTS <br />EPHESUS ELEMENTARY SCHOOL <br />CURRENT CONDITIONS: 13 <br />• seven mobile units on -site housing Pre -K, music, ESL, & <br />administration /guidance offices <br />• Administration area & cafeteria /kitchen are too small <br />• Additional classrooms, science project room, music classroom, <br />& administration /staff support spaces are needed <br />• Main entrance through the atrium does not provide a secure <br />and easily monitored entry point <br />• Interior layout of existing building is inefficient, many <br />classrooms have no windows <br />• Aging mechanical system <br />Year Built: 1971 <br />Additions: 1975. 1989 <br />Last Renovation: 2012 <br />Area: 66,952 sf <br />Acres: 13.4 <br />Student Capacity (per SAPFO): 448 Students <br />2013 ADM: 441 Students <br />Construction: Load - bearing CMU wall construction <br />I-iAI'EL HILL <br />ARRBORO <br />.1 �r� 5C. 11 0 C LS <br />