Browse
Search
Agenda - 04-28-2015 - 1 and 2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 04-28-2015 - Work Session
>
Agenda - 04-28-2015 - 1 and 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2015 11:02:48 AM
Creation date
4/24/2015 11:04:55 AM
Metadata
Fields
Template:
BOCC
Date
4/28/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
1 and 2
Document Relationships
Minutes 04-28-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY SCHOOLS <br />2016 -2026 CAPITAL INVESTMENT PLAN <br />Scope of Work <br />YEAR 1 <br />2015 -16 <br />Year 2 <br />2016 -2017 <br />Year 3 <br />2017 -2018 <br />Year 4 <br />2018 -2019 <br />Year 5 <br />2019 -2020 <br />YEAR 6-10 <br />SUMMARY <br />Location <br />RESURFACE BASKETBALL COURTS <br />CP <br />$20,000 <br />REPLACE CONCRETE PAVEMENT FOR BASKETBALL COURTS <br />HES <br />$50,000 <br />REPAVE WALKING TRACK <br />HES <br />$30,000 <br />REPAVE WALKING TRACK <br />NEW HOPE <br />$12,500 <br />ATHLETIC FACILITIES RESERVE <br />$250,000 <br />$163,900.00 <br />PLAYGROUND /PLAYZONEIMPROVEMENTS <br />$100,000 <br />CLASSROOM /BUILDING IMPROVEMENTS <br />IMPROVE SCIENCE CLASSROOM AD PREP ROOMS TO MEET <br />CURRENT NCBOE STANDARDS <br />CRHS <br />INSTALL DUCTED FUME HOODS <br />CRHS <br />PROVIDE SEPARATE CHEMICAL PREP AREAS <br />CRHS <br />IMPROVE SCIENCE CLASSROOM AD PREP ROOMS TO MEET <br />CURRENT NCBOE STANDARDS <br />CWS <br />IMPROVE SCIENCE CLASSROOM AD PREP ROOMS TO MEET <br />CURRENT NCBOE STANDARDS <br />GHMS <br />NEW FLOOR DRAIN (KITCHEN) <br />CP <br />$1,600 <br />NEW FLOOR SINK (KITCHEN) <br />CP <br />$4,500 <br />NEW LAVATORY IN KITCHEN WITH MIXING VALVE <br />CP <br />$1,950 <br />NEW TROUGH DRAIN (KITCHEN) <br />CP <br />$10,000 <br />REPLACE 2 COMPARTMENT PREP SINKS WITH 3 <br />COMPARTMENT SINKS <br />CP <br />$5,000 <br />UPGRADE FLOOR DRAINS NEAR STEAMER AND BRAISING <br />PAN <br />CP <br />$3,000 <br />ADD ADDITIONAL HAND SINK <br />CP <br />$2,500 <br />REPLACE COLD STORAGE UNIT <br />CP <br />$55,000 <br />REPLACE REACH -IN REFRIGERATORS <br />CP <br />$13,000 <br />SITE WORK TO ADDRESS EROSION ISSUES AROUND <br />CAMPUS; REPAIR WATER METER BOX AND COVER; <br />DUMPSTER PAD AND ENCLOSURE <br />CRHS <br />$25,000 <br />2016 PAY -AS- YOU -GO FUNDING <br />PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.