Orange County NC Website
Page 1of2 <br />_0 <br />Michael Harvey <br />From: Grant Gale <br />Gent Thursday, April 17'2OO8U:3QAM <br />To: Michael Harvey <br />Subject: 711 Terry Road <br />T{}: Michael Harvey, AICP,Zoning Enforcement Officer <br />FROM: J.GnantGo)e. Solid Waste Enforcement Supervisor <br />DATE: April 17.2UD8 <br />SUBJECT: P�0JECT~711 Terry Road Comments <br />The Solid Waste Department Staff have reviewed the plans and have the following comments: <br />General Comments: <br />Contact Solid Waste Staff: <br />Solid Waste staff strongly urges the applicant to contact Solid Waste staff to clarify recycling issues to streamline review <br />and revisions for solid vvaeta needs. <br />Property is currently eligible for recycling service provided by Orange County Solid Waste. <br />Requested Stipulations or Conditions <br />Need Solid Waste Management Plan: <br />We recommend that a Solid Waste Management Plan be developed for this project. Specifically, this plan should address <br />how landclearing, demolition, and construction wastes will be disposed of and if recyclables and waste generation rates <br />have been considered in planning for waste collection services. VVe recommend that this plan ba initiated on soon oo <br />possible so that the collection of recyclables can be considered as the site plan is being developed. VVe recommend the <br />applicant contact Solid Waste Staff at818-2Q42 for assistance in developing the Solid Waste Management Plan. <br />' <br />Need <br />VVa recommend that prior to issuance ofaZoning Compliance Permit the applicant specifically provide for corrugated <br />cardboard recycling, addressing compliance with RRMO cardboard recycling requirements. \A/e believe that osecond <br />dumpster to be utilized for recyclable cardboard may be necessary and should be incorporated into any Site Plan <br />changes. <br />Pre-construction Meeting Stipulation: <br />We'rec6mmend that the applicant be stipulated eoo condition ofpermit issuance to hold the pre-demolition and pre- <br />construction <br />Deconstruction Assessment Stipulation: <br />VVe recommend that the applicant be stipulated to hold a deconstruction assessment meeting with Orange County staff <br />(Roderick Jones 918-2942) concerning the buildings to be removed from this site. We also recommend the following note <br />.be placed on the final plans: "Prior to any demolition or construction activity on the site the applicant will hold o <br />deconstruction assessment conference with the County's Solid Waste staff concerning buildings to be removed from this <br />areas, Refuse and Recycling Area Dimension Details: <br />The revised plans must include a separate, to-scale, dimensioned detail of any proposed refuse/recycling collection <br />including pad length, width, and depth, associated screening, overhead clearances, and protective bollards. Bollards <br />must be 6" CID steel, with two bollards centered behind each bulk waste container and placed 1' off the back wall of the <br />enclosure. Dbmpster, roll-cart, and compactor details should be provided to scale. Preferable scales for the detail are 1" <br />= 10' or V = 20'. The revised plans label each bulk waste container for type of material to be collected. It is unclear from <br />the initial design how trash and recycling will be handled. Applicant appears to provide adequate room for <br />recycling carts for paper and container recycling. Applicant must provide a 32.5'turn radius to allow vehicle to <br />enter site, access recycling carts, turn around and exit the site. Space for bulk refuse appears inadequate. <br />Dumpster Gates: <br />