Browse
Search
Agenda - 05-01-2008-5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 05-01-2008
>
Agenda - 05-01-2008-5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:18:29 AM
Creation date
8/28/2008 10:10:36 AM
Metadata
Fields
Template:
BOCC
Date
5/1/2008
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes - 20080501
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />MEMORANDUM <br />TO: Board of County Commissions <br />Laura Blackmon, County Manager <br />COPIES: Willie Best, Asst. County Manager <br />Pam Jones, Director of Purchasing and Central Services <br />Donna Coffey, Budget Director <br />FROM: Paul Thames, PE, County Engineer <br />DATE: April 23, 2008 <br />SUBJECT: Central Efland Bond/northern Buckhorn community sewer expansion <br />process <br />As per recent presentations to and directives from the BOCC relative to proceeding with <br />the development of the Northern Buckhorn Community and the Central Efland sewer <br />collection system project, the following tasks have been initiated or completed: <br />1) Project construction plans and specifications have been completed, subject to <br />project scope revisions mandated by review and funding agencies, and <br />2) The BOCC, at the April 1, 2008 segment of the public hearing indicated a <br />consensus in completing the entire project as a single phase, with projected <br />funding shortfall (approximately $1.7 million) to be funded by borrowing against <br />the FY 2010-11 <br />3) All ancillary permits (NCDOT, erosion control, etc.) have been acquired, and <br />4) The preliminary Engineer's Report (the document submitted for review and <br />funding agency approval) has been completed, subject to potential project scope <br />revisions mandated by review and funding agencies; and <br />5) All grant funding requirements related to the project public hearing - <br />advertisement for public hearing; copies of the preliminary Engineer's Report <br />have been placed in locations accessible to the general public and to the <br />projected customer base for the proposed project; public comment received at <br />the April 1, 2008 public hearing; and BOCC discussion of the project scope and <br />financing, and <br />6) The preliminary Engineer's report has been distributed to the BOCC and key <br />departments, and <br />7) The preliminary version of the Raftelis Sewer Rate Study model has been <br />received and is currently being evaluated and modified by staff, and <br />8) Discussions have been initiated with Duke Energy to facilitate the installation of <br />three phase power down to the proposed Brookhollow Rd. pumping station. <br />
The URL can be used to link to this page
Your browser does not support the video tag.