Browse
Search
Agenda - 05-01-2008-4h6
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 05-01-2008
>
Agenda - 05-01-2008-4h6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:19:21 AM
Creation date
8/28/2008 10:09:48 AM
Metadata
Fields
Template:
BOCC
Date
5/1/2008
Document Type
Agenda
Agenda Item
4h6
Document Relationships
Minutes - 20080501
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
district. It should be noted that there have been major increases in apartment <br />enrollments in the past several years. <br />• Total elementary growth: This is projected elementary growth far the SAPFO year on <br />November 15 of that year. <br />• Available Capacity at 105%: This represents the SAPFO capacity of the elementary <br />schools at 105% using the capacity of schools with a 1 to 21 ration in grades K-3 and 1 <br />to 26 in grades 4 and 5. <br />• Projected Enrollment: This is the SAPFO approved projected elementary enrollment <br />• Available Seats: This represents the remaining capacity in the elementary schools <br />before reaching 105%. <br />CAPS: If the projections are correct, then would a CAPS be issued if capacity remains. <br />In both 2009 and 2010 SAPFO years, there is available capacity for approving CAPS. This <br />includes the estimated number of students generated by CAPS issued previously. This <br />changes if growth is much larger than expected. <br />In 2009-10, based on the average generation rate, there are 1,450 units of CAPS available. <br />The. three year average of CAPS units is 444 units. That would indicate that the issuance of <br />CAPS should not be a problem for the next two years. <br />The question arises in 2010 as to whether CAPS will be denied if elementary 11 is pushed <br />back to an opening date of 2011. If funding is provided to open elementary 11 in August of <br />2011, additional capacity can be added at that time. Based an the estimated time it takes to <br />complete the town approval process and finish construction, projects starting the town <br />approval process after December 2009 would most likely get certificates of occupancy after <br />June of 2011. These CAPS would be approved based on the increased capacity that the <br />opening of elementary 11 would provide. With available capacity in the 2009-10 years, na <br />CAPS would be denied. <br />This scenario is based on projections, any larger than expected increase in enrollment could <br />change the availability. That said, the change in the admission date for kindergarten must <br />also be considered. The ,State of NC has changed the date that students must be age five <br />before they can enroll. That change will move the October 16 cutoff date to August 31 <br />starting in the 2009-10 school year. Projections indicate that 80 fewer students would enroll <br />in Kindergarten that year thus increasing available capacity. Consequently, there would be a <br />rise in enrollment in the 2010-11 school year. CAPS requested during the 2010-11 school <br />year would be applied to the 2011-12 capacity with elementary 11 on schedule to open, thus <br />the impact of that increase would be minimal. <br />The projected level of service in 2010-2011 is projected to be 10b.$ o-o. This is similar to the <br />LOS before Rashkis opened. <br />Please feel free to contact me if you have any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.