Browse
Search
2015-165 AMS - Lomax Construction Company, Inc. for Proposed Change Order #2 - unforeseen field conditions (contingency) allowance reconciliation $13,050
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-165 AMS - Lomax Construction Company, Inc. for Proposed Change Order #2 - unforeseen field conditions (contingency) allowance reconciliation $13,050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2016 2:26:14 PM
Creation date
4/9/2015 2:17:04 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-165 AMS - Lomax Construction Co, Inc. - Change Order #2 unforeseen field conditions (contingency) allowance reconciliation
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k0""`�PSNCEkEJ?GK <br />A SCANA COMPANY <br />ESTIMATE TO RELOCATE NATURAL GAS LINE <br />Customer Name: Lomax Construction Company - Van Reed <br />Billing Address: PO Box 35169 Greensboro, NC 27425 <br />Work Location: 229 N Hassell St (Intersection of N Hassell and W Tryon St <br />Description of relocation work: Lower 2" Steel Main In conflict with proposed drain pipe <br />Special Conditions: <br />1. PSNC ENERGY is regulated by the North Carolina Utilities Commission in <br />the relocation of our facilities and can only recover our actual cost of <br />relocating the facilities. <br />2. This is an estimate only. The actual cost will be billed to the Customer <br />after the relocation work is completed. <br />3. PSNC will call North Carolina One Call to notify other utilities to mark <br />underground facilities. <br />4. Private underground lines are to be located by the Customer. PSNC <br />Energy will not be responsible for damage to private lines that are not <br />marked or marked incorrectly. <br />Estimate valid for 60 daysl <br />Estimate total: $ 3300" <br />PSNC Representative Signature: Date: 6/1012014 <br />Customer Signature: Date: <br />Customer Contact Telephone Number: <br />•'r Work to be performed by PSNC Energy upon receipt of prepayment of the total estimated <br />amount by Lomax Construction Company, An Invoice for PSNC's actual cost of relocation will be <br />submitted after completion of the work and will reflect the prepayment received. Lomax <br />Construction Company reimbursement obligation extends to cover all of PSNC's actual costs, <br />including but not limited to materials, labor, overheads, taxes, unforeseen construction costs and <br />rock excavation. a <br />PSNC Form 0 &E -001A Original --- PSNC Energy Yellow — Customer <br />PSNC 09 -001 July 20, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.