Orange County NC Website
M A X <br /> 1st Floor Renovation of R.E. Whitted Building A <br /> C' � rti l� � [ �, � _ � �� � CRA Project No. 1218; Lomax Project No. 14002 <br /> Date: �# <br /> Proposal Number: 8 Brief Description STORM DRAIN REVISIOM= Time Extension i Days <br /> ORIGINAL COST TO INSTALL LINE DEEPER IN THE GROUND UNDER EXISTING SEWER <br /> Proposed Work: NEW COST TO MOVE GAS LINE AND TO MOVE EXISTING WATER LINE. <br /> Due to the time sensitive nature of the work and volatility in prices this proposal is only valid for ; 5 Days <br /> LABOR TOTAL MATERIAL TOTAL SUB SUB Total GRAND <br /> DESCRIPTION QTY UNIT Unit Cost LABOR Unit Cost Material Unit Cost Unit Cost COST TOTAL <br /> JOHN BAKER PLUMBING 1 0' 0 3265.00; 32651 3,265 <br /> 01 0 0', 0 <br /> PSNC ENERGY 1 0 0 3300.00 3300 3,300 <br /> 01 _ 0 0 0 - <br /> -�- p'' - - 0 0 0 - -- <br /> 0 0 - 0 0 --- <br /> _ T '~ 0' 01 - --0' - 0 <br /> 6,565 <br /> SUBTOTAL 0 0 -- � — ----- 0 - - <br /> PAYROLL TAX 8�INSURANCE 40/6 0, __ 0 <br /> ----- <br /> - T ---� --� - - -- <br /> SALES TAX 6.75/o O 0 <br /> SUBTOTAL SUBCONTRACTOR _ 6565 6,565 <br /> OVERHEAD &PROFIT ON SUB ITEMS 5% -� <br /> o --- 328 328 <br /> r - ------ - - - <br /> -- -- <br /> SUBTOTAL G.C. I, � 0.00 0 <br /> 0.00 0 <br /> OVERHEAD&PROFIT ON G.C. ITEMS 10/o' <br /> -- - -- ---- ----- -- -- <br /> 0 - <br /> 0 0 i <br /> SUBTOTAL G.C.AND SUB ! _ 6 893 <br /> - --- ----- - /o _ - -- -- --- T- — � - -- y- -- - - -- - - <br /> BUILDERS RISK 0.24 <br /> 17 17 <br /> i <br /> -- — 103 103 <br /> BONG - ---- .-1_50% -- --�-- -- �---- -- --�- ------- --- �- - -- - - - --- <br /> GRAND TOTAL -- - $ 7,013 $ 7,013 <br />