• ri.: <br />® <br />,D, Document G701"- 2001 Instructions <br />Change Order <br />GENERAL INFORMATION <br />Purpose <br />AIA Document G701 is for implementing changes in the Work agreed to by the Owner, Contractor and Architect. <br />Execution of a completed G701 indicates agreement upon all the terms of the change, including any changes in <br />the Contract Sum (or Guaranteed Maximum Price) and Contract Time. <br />Use of Current Documents <br />Prior to using any AIA Contract Document, users should consult www.aia.org or a local AIA component to verify <br />the most recent edition. <br />Reproductions <br />This document is a copyrighted work and may not be reproduced or excerpted from without the express written <br />permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The <br />American Institute of Architects confer any further rights to reproduce this document. <br />The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed <br />G701, but only for use in connection with a particular project. The AIA will not permit reproduction outside of the <br />limited license for reproduction granted above, except upon written request and receipt of written permission from <br />the AIA. <br />Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should <br />consult the End User License Agreement (EULA). <br />To report copyright violations of AIA Contract Documents, e -mail The American Institute of Architects' legal <br />counsel, copyright @aia.org. <br />COMPLETING G701 -2001 <br />Description of Change in the Contract <br />Insert a detailed description of the change or reference specific exhibits describing, in detail, the change to be <br />made in the Contract by this Change Order. Include any drawings, specifications, documents or other supporting <br />data to clarify the scope of the change. <br />Determination of Costs <br />Insert in the blanks provided, or strike out the terms in parentheses that do not apply, the original Contract Sum or <br />Guaranteed Maximum Price; the net change by previously authorized Change Order (note that this does not <br />include changes authorized by Construction Change Directive unless such changes were subsequently agreed to <br />by the Contractor and recorded as a Change Order); the Contract Sum or Guaranteed Maximum Price prior to this <br />Change Order; the amount of increase or decrease, if any, in the Contract Sum or Guaranteed Maximum Price; <br />and the new Contract Sum or Guaranteed Maximum Price as adjusted by this Change Order. <br />Change in Contract Time <br />Insert in the blanks provided, and strike out the unused terms in parentheses, the amount (in days) of the increase <br />or decrease, if any in the Contract Time. Also insert the date of Substantial Completion, including any adjustment <br />effected by this Change Order. <br />EXECUTING THE DOCUMENT <br />When the Owner and Contractor, in occurrence with the Architect, have reached agreement on the change to be <br />made in the Contract, including any adjustments in the Contract Sum (or Guaranteed Maximum Price) and _ <br />Contract Time, G701 should be executed in triplicate by the two parties and the Architect, each retaining an <br />original. <br />AIA Document G701 TM —2001. Copyright ©1979, 1987, 2000, and 2001 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, <br />or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. <br />Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail <br />The American Institute of Architects' legal counsel, copyright @aia.org. 102609 <br />