Orange County NC Website
i <br /> 1st Floor Renovation of R.E. Whitted Building A <br /> EOMAX <br /> C' � � ,�, l� �� CIA � CRA Project No. 1218; Lomax Project No. 14002 <br /> Date: <br /> BASE BOARD IN FLEX SPACE Time Extension Days <br /> Proposal Number: 23 Brief Description 210 <br /> TORE OUT OLD BASEBOARD AND INSTALLED NEW LARGER BOARD TO HIDE THE OUT OF LEVEL <br /> Proposed Work: FLOORING <br /> Due to the time sensitive nature of the work and volatility in prices this proposal is only valid for 5 Days <br /> LABOR TOTAL MATERIAL TOTAL SUB SUB Total GRAND <br /> DESCRIPTION QTY UNIT Unit Cost LABOR Unit Cost Material Unit Cost Unit Cost COST TOTAL <br /> I <br /> LOMAX DEMO OF OLD BASE 3 HRS 27.50 83 0 0 83 <br /> STAN DEAN (2) MAN CREW 0 0 0 0 <br /> 2HRS PURCHASING AND DELIVERY 2 HRS 0 0 70.00 140 140' <br /> 6HRS INSTALLATION 6 HRS 0 _ 0 70.00 420 420 <br /> MATERIAL 1 INVOICE 0 0 654.78 655 _6_5.5 <br /> 0 0 <br /> U 0 - 0 ---1 <br /> - -- <br /> 1,297 <br /> SUBTOTAL <br /> 83 0 -- -- - 0 <br /> PAYROLL TAX&INSURANCE 48% 40 4 40 <br /> --- <br /> SALES TAX ! 116.75% - - 0 0' - 0 <br /> SUBTOTAL SUBCONTRACTOR 1215 1,215 <br /> OVERHEAD&PROFIT ON SUB ITEMS 10%' 121 121 <br /> SUBTOTAL G.C. 1 2.10 0.00 _ 122 122' <br /> OVERHEAD&PROFIT ON G.C. ITEMS 20%' 24, 24 <br /> -- <br /> SUBTOTAL G.C. AND SUB 1,4831 <br /> BUILDERS RISK- - — - --a 0.24% -- - --- ; - - - ! -� - T 4 <br /> 1.500/( ' -- - !-- - -- - 22r - <br /> -- - 22 <br /> ---- <br /> 1,509 $ 1,509 <br /> ------ <br /> GRANDTOTAL T - $ <br />