Orange County NC Website
1st Floor Renovation of R.E. Whitted Building A <br /> ]LOMAX <br /> CRA Project No. 1218; Lomax Project No. 14002 <br /> Date: <br /> UNSUITABLE SOILS Time Extension Days <br /> Proposal Number: 21 Brief Description RECONCILIATION <br /> Proposed Work: <br /> Due to the time sensitive nature of the work and volatility in prices this proposal is only valid for 5 Days <br /> LABOR TOTAL MATERIAL TOTAL SUB SUB Total GRAND <br /> DESCRIPTION QTY UNIT Unit Cost LABOR Unit Cost Material Unit Cost Unit Cost COST TOTAL <br /> CONTRACT ALLOWANCE 500 0 0 -20.00 -10000 -10,000 <br /> -10,000 <br /> SUBTOTAL 0 0 0 <br /> PAYROLL TAX&INSURANCE 0 0 0 <br /> SALES TAX 0 01 0 <br /> SUBTOTAL SUBCONTRACTOR -10000 -10,0001 <br /> OVERHEAD &PROFIT ON SUB ITEMS _ 0 0 <br /> SUBTOTAL G.C. j 0.00 0.00; 01 0 _ <br /> OVERHEAD&PROFIT ON G.C. ITEMS <br /> SUBTOTAL G.C.AND SUB ! 1 _ _ -10,000 <br /> BUILDERS RISK ! _ � — 0 _ 0 <br /> BOND -- — - - ---- 0 1 0 <br /> GRAND TOTAL — $ 10,000 $ (10,000) <br />