Orange County NC Website
Triangle Landscaping Inc. <br />Brad Lewis <br />Harold Walker <br />Project Manager Van Reed <br />Lomax Construction <br />l'; <br />Work to be performed: <br />Dig ditch for underground power to light poles in parking lot for duke power <br />Dig estimated +/- 840 feet min 32 inchs deep. Place 2" grey platic pipe, tape end of pipe and <br />place a 2x4 vertical to locate for later work. <br />Estimated cost for labor, material and installation of 2" pipe is $6946.00 <br />This works out to be $7.38/ linear foot. <br />Thank you, <br />Harold Walker <br />