Browse
Search
2015-165 AMS - Lomax Construction Company, Inc. for Proposed Change Order #2 - unforeseen field conditions (contingency) allowance reconciliation $13,050
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-165 AMS - Lomax Construction Company, Inc. for Proposed Change Order #2 - unforeseen field conditions (contingency) allowance reconciliation $13,050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2016 2:26:14 PM
Creation date
4/9/2015 2:17:04 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-165 AMS - Lomax Construction Co, Inc. - Change Order #2 unforeseen field conditions (contingency) allowance reconciliation
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Triangle Landscaping Inc. <br />Brad Lewis <br />Harold Walker <br />Project Manager Van Reed <br />Lomax Construction <br />l'; <br />Work to be performed: <br />Dig ditch for underground power to light poles in parking lot for duke power <br />Dig estimated +/- 840 feet min 32 inchs deep. Place 2" grey platic pipe, tape end of pipe and <br />place a 2x4 vertical to locate for later work. <br />Estimated cost for labor, material and installation of 2" pipe is $6946.00 <br />This works out to be $7.38/ linear foot. <br />Thank you, <br />Harold Walker <br />
The URL can be used to link to this page
Your browser does not support the video tag.