Browse
Search
2015-165 AMS - Lomax Construction Company, Inc. for Proposed Change Order #2 - unforeseen field conditions (contingency) allowance reconciliation $13,050
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-165 AMS - Lomax Construction Company, Inc. for Proposed Change Order #2 - unforeseen field conditions (contingency) allowance reconciliation $13,050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2016 2:26:14 PM
Creation date
4/9/2015 2:17:04 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-165 AMS - Lomax Construction Co, Inc. - Change Order #2 unforeseen field conditions (contingency) allowance reconciliation
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=1 Document G701TM - 2001 <br />Change Order <br />PROJECT: (Name and address) <br />1 st Floor Renovation <br />R.E. Whitted Building A <br />300 West Tryon Street <br />Hillsborough, NC <br />TO CONTRACTOR: (Name and address) <br />Lomax Construction, Inc. <br />PO Box 35169 <br />Greensboro, NC 27425 -5169 <br />CHANGE ORDER NUMBER: ' OWNER ❑ <br />DATE: December 23, 2014 ARCHITECT ❑ <br />CONTRACTOR ❑ <br />ARCHITECT'S PROJECT NUMBER: 1216 <br />FIELD ❑ <br />CONTRACT DATE: January 15, 2014 <br />OTHER ❑ <br />CONTRACT FOR: General Construction <br />The Contract is changed as follows: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br />COP #4.1 <br />Switch Types 1 & 2 Carpets <br />Add: <br />$ <br />2,702.00 <br />COP #8 <br />Storm Revisions - Against Allowance <br />Add: <br />$ <br />7,013.00 <br />COP #12 <br />GFI Circuits <br />Add: <br />$ <br />230.00 <br />COP #14 <br />Elevator Laminate Credit <br />Deduct: <br />$ <br />(1,575.00) <br />COP #15 <br />Hwde Allowance Adjustment <br />Add: <br />$ <br />1,376.00 <br />COP #16 <br />Remove Existing Concrete Slab & Piers <br />Add: <br />$ <br />7,600.00 <br />COP #19 <br />Duke Conduit - Allowance Adjustment <br />Add: <br />$ <br />4,195.00 <br />COP #21 <br />Credit for Unsuitable Spoil Allowance <br />Deduct: <br />$ <br />(10,000.00) <br />COP #23 <br />Wood Basde In Flex #210 <br />Add: <br />$ <br />1,509.00 <br />The original <br />(Contract Sum) ( was <br />$ <br />880,400.00 <br />The net change by previously authorized Change Orders <br />The (Contract Sum) (Eitimenteed hfweiffmm Priee ) prior to this Change Order was <br />$ 95 134 nn <br />$ 905,534.00 <br />The (Contract Sum) ( e) will be (increased) <br />by this Change Order in the amount of $ 13 0.50 On <br />The new (Contract Sum) ( ' ), including this Change Order, will be <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />The date of Substantial Completion as of the date of this Change Order, therefore, is <br />) days. <br />918,584.00 <br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price <br />that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the <br />Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />Corley Redfoot Architect <br />ARCHITECT (Firm name) <br />222 Cloister Court <br />Lomax Construction, Inc. <br />CONTRACTOR (Firm name) <br />PO Box 35169 <br />Orange County <br />OWNER (Firm name) <br />PO Box 8181 <br />Hillsborough, NC 27278 <br />ADDRES <br />BY (Signature) <br />Iq <br />(Typed name) (Typed name) (Typed name) <br />1 February 13, 2015 /"t � 8't s <br />DATE DATE DATE 1 <br />CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that <br />changes will not be obscured. <br />AIA Document G701" — 2001. Copyright ©1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or <br />any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. <br />Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail <br />The American Institute of Architects' legal counsel, copyright @aia.org. 102609 <br />
The URL can be used to link to this page
Your browser does not support the video tag.