Browse
Search
2015-165 AMS - Lomax Construction Company, Inc. for Proposed Change Order #2 - unforeseen field conditions (contingency) allowance reconciliation $13,050
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-165 AMS - Lomax Construction Company, Inc. for Proposed Change Order #2 - unforeseen field conditions (contingency) allowance reconciliation $13,050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2016 2:26:14 PM
Creation date
4/9/2015 2:17:04 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-165 AMS - Lomax Construction Co, Inc. - Change Order #2 unforeseen field conditions (contingency) allowance reconciliation
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOMAX <br />r.orrsTitur.TroN <br />TO: Corley Redfoot Architects, Inc. <br />Harry Jensen <br />222 Cloister Court <br />Chapel Hill, NC 27514 <br />REQUEST FOR INFORMATION #24 <br />DATE: 20- Mar -14 <br />PROJECT: R.E. Whitted Bldg A - 1 st Floor <br />Lomax Project No. 14002 <br />CRA Project No. 1218 <br />WE ARE THIS DATE REQUESTING THE FOLLOWING: <br />( X ) lnfonnation () Clarification ( X ) Direction <br />Mark Hall <br />The electrical prints do not show power available for the refrigerator in conference room 235. This will <br />need to be a dedicated circuit, and will need to be GFI protected to conform to code requirements. Please <br />advise on how to proceed. <br />THE ABOVE INFORMATION IN REQUESTED: <br />_ X ._- As Soon As Possible to avoid disrupting the work and /or order materials <br />IMMEDIATELY to minimize disruption and added cost already being incurred <br />No later than or the work will require additional cost <br />Thank you for your prompt attention. Please Resoond Via Fax Number: 336 -99Z -7004 or EMail. <br />Sincerely, <br />Lomax Construction, Inc, <br />Denise Holland <br />dholland0lomaxconstruction.cor i <br />Project Management Assistant <br />ARCHITECT/ ENGINEER RLNrU -NbV <br />FOR NEW REFRIGERATOR IN CONFRENCE ROOM 235, PROVIDE DEDICATED <br />GFI PROTECTED 20A BREAKER USING EXISTING SPACE IN PANEL'LP2' USING <br />3 #12* WIRING IN 1/2" CONDUIT. FIELD VERIFY ALLOWABLE PANEL SPACE AND <br />COORDINATE EXACT RECEPTACLE LOCATION WITH OWNER PRIOR TO <br />ROUGH -IN. <br />MRN <br />RNM ENGINEERS <br />3/24/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.