Orange County NC Website
1st Floor Renovation of R.E. Whitted Building A <br /> EOMAX <br /> CRA Project No. 1218; Lomax Project No. 14002 <br /> Date: <br /> REFRIGERATOR DEDICATED <br /> Proposal Number: 12 Brief Description CIRCUIT GFI RECP. IN Time Extension Days <br /> CONFERENCE RM. <br /> Proposed Work: RELATED TO RFI#24 <br /> Due to the time sensitive nature of the work and volatility in prices this proposal is only valid for 5 Days <br /> LABOR TOTAL MATERIAL TOTAL SUB SUB Total GRAND <br /> DESCRIPTION QTY UNIT Unit Cost LABOR Unit Cost Material Unit Cost Unit Cost COST TOTAL <br /> MARK HALL ELECTRICAL 1 0 0 215.00 215 215 <br /> 01 0 0 0 <br /> p', 0 -- 0 0 <br /> _ 215 <br /> SUBTOTAL OI 0 0 <br /> PAYROLL TAX&INSURANCE 4-0--/01 <br /> SALES TAX 6.75% - -- 0 0 - 0 <br /> -- -- �— <br /> SUBTOTAL SUBCONTRACTOR — 215 215 — <br /> ---- <br /> OVERHEAD&PROFIT ON SUB ITEMS 50/6 <br /> - -- 0 i <br /> 0.00 - <br /> SUBTOTAL G.C. 0.00; -- <br /> OVERHEAD &PROFIT ON G.C. ITEMS 10%'' _�— 0 0 <br /> SUBTOTAL G.C.AND SUB T 2261 <br /> BUILDERS RISK 0.24% <br /> BOND -- 1.50%,I — -- — ---- 3 - - <br /> GRAND TOTAL $ 230 $ 230 <br />