Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> operations from the existing structure(s) on the property ceased approximately 10 to 15 years <br /> ago. <br /> In reviewing the proposal from a land use perspective, staff has determined this facility is <br /> designated as a Government Facilities and Office Buildings land use,which is a permitted use of <br /> property within the AR zoning district subject to administrative site plan approval as detailed <br /> within Section 2.5 Site Plan Revieii, of the Orange County Unified Development Ordinance <br /> (UDO). <br /> In accordance with Section 2.5.4 of the UDO staff is pleased to inform you we have I <br /> APPROVED WITH CONDITIONS the site plan and hereby issue the Zoning Compliance <br /> Permit allowing for the commencement of earth disturbing/renovation activities in order to re- <br /> establish the community center use. <br /> Please note even with the issuance of the Zoning Compliance Permit initiation of <br /> development activities may not commence until all required permits are obtained (i.e. Building, I <br /> Erosion Control/Stormwater, Environmental Health, Solid Waste, etc.) and the revised site plan <br /> has been submitted. <br /> As a condition of approval, staff is requesting the site plan be amended as follows: <br /> 1. Sheet C0.0, zoning of property,please modify the note to read as follows: <br /> Current Zoning. Agricultural Residential(AR) <br /> Upper Eno Protected and <br /> Little River Protected Watershed Overlay District <br /> 2. Sheet C0.0,impervious surface data,needs to be modified as follows: <br /> Per Section 4.2.6 of the UDO impervious surface area in the Upper Eno is limited to 12% <br /> of land area and includes: building, gravel, asphalt,etc. <br /> The 47.8 acre parcel, where the community center and park are located, is limited to <br /> 249,860 sq. ft. of impervious surface area or approximately 5.7 acres. Please note there is <br /> approximately 4.3 acres of impervious surface area already on the property based on our <br /> records. <br /> Impervious surface in the Little River is limited to 12% of land area. The 12.2 acre i <br /> undeveloped parcel, east of NC Highway 86 across the street from the community center, <br /> is allowed a total of 64,189 sq.ft. of impervious surface area or 1.44 acres. <br /> Please revise the existing table to incorporate this information accordingly. <br /> 3. As required under Section 2.5 Site Plan Revietii,of the UDO the site plan needs to include <br /> the following: <br /> a. A development summary on Sheet C0.0 including: <br /> i. Nature of the project (i.e. a brief statement on what the site is being <br /> redeveloped for), <br /> ii. Total existing/proposed building square footages/floor areas. <br /> iii. Estimated traffic generated by the proposed development in trips per day, i <br /> iv. Proposed impervious surface area for the project, <br /> I <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.