Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> Cedar Grove Community Center <br /> CLH Project No: 13-112 <br /> Orange County,North Carolina <br /> CLH Design,PA <br /> 400 Regency Forest Drive,Suite 120 <br /> Cary,NC 27518 <br /> 919-319-6716 <br /> Addendum 12-February-2015 <br /> Where any article, division or subparagraph of the original contract documents or other addenda is <br /> supplemented herein, the provisions of the original documents shall remain in effect. All the <br /> supplemental provisions shall be considered as added thereto. Where any such article, division or <br /> subparagraphs are amended, voided or superseded thereby, the provisions of such article, division or <br /> subparagraph not so specifically amended,voided or superseded shall remain in effect. <br /> The attention of the Contractor is called to the following clarifications, additions to and changes in the <br /> plans and specifications dated 11 November 2014 on the above job. It will be the responsibility of each <br /> Contractor to call such clarifications, additions to and changes in the plans and specifications to the <br /> attention of subcontractors concerned. The Engineer in no way assumes any responsibility for notifying <br /> any subcontractor,material dealers or others not having received the original contract documents. <br /> ITEM 1. GENERAL CONTRACT <br /> Refer to the following attached Permit: <br /> Orange County Conditional Notice of Approval-SPR14-0006. <br /> Clarification:Contractor shall review and abide all conditions stated within this permit. <br /> The required modifications to the site plan that the approval suggests have been <br /> incorporated in to the documents dated 11-November-2014. <br /> ITEM 2. GENERAL CONTRACT <br /> Refer to the following attached Permit: <br /> NCDENR Erosion Control Approval-Project ID: ORANG-2015-010 <br /> Clarification: Contractor shall review and abide all conditions stated within this permit. <br /> The requested modifications to the plans that the approval suggests have been <br /> incorporated in to the documents dated 11-November-2014. The Yellow Placard that is <br /> to be placed on site has been sent to the owner. Construction can begin with the enclosed <br /> approval. <br /> ITEM 3. GENERAL CONTRACT <br /> Refer to the following attached Permit: <br /> NCDOT Driveway Permit: <br /> Clarification:Contractor shall review and abide all conditions stated within this permit. <br /> ITEM 4. GENERAL CONTRACT <br /> Refer to the following drawing C1.1: <br />
The URL can be used to link to this page
Your browser does not support the video tag.