Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> SECTION 01 22 00-UNIT PRICES <br /> a. Excavation,loading,transport, placement,and compaction of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> D. Unit Price No.4: Unsuitable Soils Removal and Disposal Off-Site: <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport and disposal of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> E. Unit Price No.5: Replacement of Authorized Excavation of Unsuitable Soils or Rock with On-Site Suitable Soils: <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard, compacted in place. <br /> 3. Include the following in the unit price: <br /> a. Suitable soil materials from a location to be determined on the project site. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. Unit price shall not include the excavation of unsuitable soil <br /> or rock. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> F. Unit Price No.6: Replacement of Authorized Excavation of Unsuitable Soils or Rock with Off-Site Suitable Soils: <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard,compacted in place. <br /> 3. Include the following in the unit price: <br /> a. Suitable soil materials from a location to be determined on the project site. <br /> b. Excavation, loading, on-site transport, placement, moisture control and compaction of suitable soil mate- <br /> rials. <br /> c. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. Unit price shall not include the excavation of unsuitable soil <br /> or rock. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> G. Unit Price No.7: Replacement of Authorized Excavation of Unsuitable Soils or Rock with Aggregate Base Course <br /> (ABC)Stone Material: <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard,compacted in place. <br /> 3. Include the following in the unit price: <br /> a. ABC materials from Contractor's off-site source. <br /> b. Excavation,loading,transport,moisture control and compaction of materials. <br /> c. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. Unit price shall not include the excavation of unsuitable soil <br /> or rock. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> H. Unit Price No. 8: Replacement of Authorized Excavation of Unsuitable Soil or Rock with#57 Washed Stone Mate- <br /> rial: <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard, compacted in place. <br /> 3. Include the following in the unit price: <br /> a. #57 Washed Stone materials from Contractor's off-site source. <br /> ©BOOMERANG DESIGN#1315 01 2200-2 Cedar Grove Community Center <br /> Orange County 11/11/14 <br /> ADDENDUM#3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.