2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> SECTION 01 22 00-UNIT PRICES <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. This Section includes administrative and procedural requirements for unit prices. <br /> B. Related Sections include the following: <br /> 1. Division 01,Section"Allowances"for procedures for using unit prices to adjust quantity allowances. <br /> 2. Division 01, Section "Contract Modification Procedures" for procedures for submitting and handling Change <br /> Orders. <br /> 1.2 DEFINITIONS <br /> A. Unit price is an amount proposed by bidders, stated on the Bid Supplement Form, as a price per unit of measure- <br /> ment for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimat- <br /> ed quantities of Work required by the Contract Documents are increased or decreased. <br /> 1.3 PROCEDURES <br /> A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, <br /> and profit. <br /> B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit <br /> prices.Methods of measurement and payment for unit prices are specified in those Sections. <br /> C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit <br /> prices and to have this work measured, at Owner's expense, by an independent surveyor acceptable to Contrac- <br /> tor. <br /> D. List of Unit Prices: A list of unit prices is included at the end of this Section. Specification Sections referenced in <br /> the schedule contain requirements for materials described under each unit price. <br /> PART 2-PRODUCTS(Not Used) <br /> PART 3-EXECUTION <br /> 3.1 LIST OF UNIT PRICES <br /> A. Unit Price No. 1: Rock Removal in Open Areas(Mass Rock)and Disposal Off-Site: <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport and disposal of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> B. Unit Price No.2: Rock Removal in Trenches and Pits(Trench Rock)and Disposal Off-Site: <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation, loading,transport and disposal of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> C. Unit Price No.3: Unsuitable Soils Removal and Disposal On-Site: <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> ©BOOMERANG DESIGN#1315 01 22 00-1 Cedar Grove Community Center <br /> Orange County 11/11/14 <br /> ADDENDUM#3 <br />