Orange County NC Website
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> SECTION 01 21 00-ALLOWANCES <br /> b. Excavation, loading, on-site transport, placement, moisture control and compaction of suitable soil mate- <br /> rials. <br /> c. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. Unit Price shall not include the excavation of unsuitable soil <br /> or rock. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity: 100 cu.yd. <br /> F. Quantity Allowance No. 6: Replacement of Authorized Excavation of Unsuitable Soils or Rock with Off-Site Suita- <br /> ble Soils <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard,compacted in place. <br /> 3. Include the following in the unit price: <br /> a. Suitable soil materials from Contractor's off-site source. <br /> b. Excavation, loading, on-site transport, placement, moisture control and compaction of suitable soil mate- <br /> rials. <br /> c. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. Unit Price shall not include the excavation of unsuitable soil <br /> or rock. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity:2000 cu.yd. <br /> G. Quantity Allowance No. 7: Replacement of Authorized Excavation of Unsuitable Soils or Rock with Aggregate <br /> Base Course(ABC)Stone Material <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard,compacted in place. <br /> 3. Include the following in the unit price: <br /> a. ABC materials from Contractor's off-site source. <br /> b. Excavation, loading, on-site transport, placement, moisture control and compaction of materials. <br /> c. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. Unit Price shall not include the excavation of unsuitable soil <br /> or rock. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity:400 cu.yd. <br /> H. Quantity Allowance No. 8: Replacement of Authorized Excavation of Unsuitable Soils or Rock with#57 Washed <br /> Stone Material <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard,compacted in place. <br /> 3. Include the following in the unit price: <br /> a. #57 washed stone materials from Contractor's off-site source. <br /> b. Excavation,loading, on-site transport, placement,moisture control and compaction of materials. <br /> c. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. Unit Price shall not include the excavation of unsuitable soil <br /> or rock. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity: 100 cu.yd. <br /> I. Contingency Allowance No. 9: Provide$262,514.00,include in Bid for an Owner-Contingency Allowance. <br /> J. Waterproofing Allowance No. 10: Provide $7,500, include in Bid for waterproofing under resilient sports flooring <br /> and sheet vinyl flooring.Allowance usage to be determined based upon slab testing listed in the product specifica- <br /> tions. <br /> END OF SECTION 01 21 00 <br /> ©BOOMERANG DESIGN#1315 0121 00-3 Cedar Grove Community Center <br /> Orange County 11/11/14 <br /> ADDENDUM#3 <br />