Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> SECTION 01 21 00-ALLOWANCES <br /> 3.2 PREPARATION <br /> A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that <br /> each allowance item is completely integrated and interfaced with related work. <br /> 3.3 SCHEDULE OF ALLOWANCES[-GENERAL CONSTRUCTION CONTRACT] <br /> A. Quantity Allowance No. 1: Rock Removal in Open Areas(Mass Rock)and Disposal Off-Site <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport,and disposal of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity: 10 cu.yd. <br /> B. Quantity Allowance No.2: Rock Removal in Trenches and Pits(Trench Rock)and Disposal Off-Site <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport,and disposal of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity: 10 cu.yd. <br /> C. Quantity Allowance No.3: Unsuitable Soils Removal and Disposal On-Site <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport,placement and compaction of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity: 100 cu.yd. <br /> D. Quantity Allowance No.4: Unsuitable Soils Removal and Disposal Off-Site <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport,and disposal of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity:2500 cu.yd. <br /> E. Quantity Allowance No. 5: Replacement of Authorized Excavation of Unsuitable Soils or Rock with On-Site Suita- <br /> ble Soils <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard,compacted in place. <br /> 3. Include the following in the unit price: <br /> a. Suitable soil materials from a location to be determined on the project site. <br /> ©BOOMERANG DESIGN#1315 01 2100-2 Cedar Grove Community Center <br /> Orange County 11/11/14 <br /> ADDENDUM#3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.