DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> SECTION 01 21 00-ALLOWANCES <br /> 3.2 PREPARATION <br /> A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that <br /> each allowance item is completely integrated and interfaced with related work. <br /> 3.3 SCHEDULE OF ALLOWANCES[-GENERAL CONSTRUCTION CONTRACT] <br /> A. Quantity Allowance No. 1: Rock Removal in Open Areas(Mass Rock)and Disposal Off-Site <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport,and disposal of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity: 10 cu.yd. <br /> B. Quantity Allowance No.2: Rock Removal in Trenches and Pits(Trench Rock)and Disposal Off-Site <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport,and disposal of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity: 10 cu.yd. <br /> C. Quantity Allowance No.3: Unsuitable Soils Removal and Disposal On-Site <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport,placement and compaction of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity: 100 cu.yd. <br /> D. Quantity Allowance No.4: Unsuitable Soils Removal and Disposal Off-Site <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard in place prior to excavation. <br /> 3. Include the following in the unit price: <br /> a. Excavation,loading,transport,and disposal of all materials. <br /> b. Overhead and profit. <br /> 4. Include all other related costs in the contract sum. <br /> 5. Method of Measurement: Quantities will be verified by a soils and materials engineer employed by the Owner. <br /> 6. Allowance Quantity:2500 cu.yd. <br /> E. Quantity Allowance No. 5: Replacement of Authorized Excavation of Unsuitable Soils or Rock with On-Site Suita- <br /> ble Soils <br /> 1. Purpose: To adjust the contract sum in case a quantity different from that indicated in the allowance is re- <br /> quired. <br /> 2. Unit of Measurement: Cubic yard,compacted in place. <br /> 3. Include the following in the unit price: <br /> a. Suitable soil materials from a location to be determined on the project site. <br /> ©BOOMERANG DESIGN#1315 01 2100-2 Cedar Grove Community Center <br /> Orange County 11/11/14 <br /> ADDENDUM#3 <br />