Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> ADDENDUM THREE <br /> ADDENDUM NO.THREE <br /> z; <br /> to <br /> Contract Documents for 1 <br /> DesieN <br /> a <br /> CEDAR GROVE COMMUNITY CENTER RENOVATION <br /> Date: February 12,2015 6131 Falls of Neuse Rd.,Suite 204 <br /> Raleigh, North Carolina 27609 <br /> Boomerang Design (919)573-6400 <br /> Project No.: 1315 File: B-8.2 <br /> NOTICE TO BIDDERS: <br /> This addendum is issued pursuant to the General Conditions of the Contract for Construction, and is <br /> hereby made a part of the Contract Documents. <br /> The addendum serves to clarify, revise, and supersede information in the Project Manual, the Drawings <br /> and Addenda (if any),which have previously been issued. It should be bound in the Project Manual for the <br /> project. <br /> GENERAL: <br /> Prebid Sign-in Sheet. The email address listed for Lomax Construction is incorrect. The Prebid Sign-In <br /> Sheet is being reissued with the correct email address. <br /> ITEMS PERTAINING TO THE PROJECT MANUAL: <br /> Section 00 43 13—Form of Bid Bond <br /> Delete the section and replace with attached new Section 00 43 13. <br /> Section 00 43 21—Bid Supplement-Allowance <br /> Delete the section and replace with attached new Section 00 43 21. <br /> Section 00 43 22—Bid Supplement—Unit Prices <br /> Delete the section and replace with attached new Section 00 43 22. <br /> Section 0114 01—Work Restrictions <br /> Delete Paragraph 1.1.A.2. Renumber Paragraph 1.1.A.3 to 1.1.A.2. <br /> Delete Paragraph 1.1.A.3.c in its entirety. <br /> Delete Paragraph 1.2.A. Renumber Paragraph 1.2.13 to 1.2.A. <br /> Section 012100—Allowances <br /> Delete the section and replace with attached new Section 012100 <br /> Section 0122 00—Unit Prices <br /> Delete the section and replace with attached new Section 012100 <br /> ©BOOMERANG DESIGN#1315 Cedar Grove Community Center <br /> Orange County <br /> ADDENDUM#3 02/12/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.