Orange County NC Website
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> ■ Your Bid Bond must be attached to the bid form in order for your bid to be read at the bid opening. <br /> • "Minority Business Participation Affidavit" (goal of 10%or more) <br /> • Bid Form Supplements <br /> • Alternates <br /> • Allowances <br /> • Unit Prices <br /> • E-Verify Affidavit <br /> • Contractor's Safety Record Information <br /> • Alternates: Owner's preferred brand alternates. <br /> • Per GS 133-3 Owner would like to bid preferred brand items in keeping with the County systems and <br /> operations. Items include: <br /> • Alternate No. 1: Mitsubishi mechanical components to Align with Owner provided <br /> components described in Division 23. <br /> • Alternate No. 2:Site Improvements shown on the civil drawings <br /> • Alternate No.3: Demo existing doors and hardware in the storage wings and install new doors and <br /> hardware as indicated in the documents. <br /> • Alternate No.4: Demo existing window frames in the storage wings and provide new window <br /> assemblies as indicated in the documents. <br /> Permits <br /> • The General Contractor is responsible for securing and paying for all permits per the General Conditions. <br /> • Orange County Building and Zoning:The County has reviewed and commented on the documents for permit <br /> approval. Revised documents were sent in this week incorporating all of the County's comments. <br /> • Orange County Planning:Approved with conditions.Should be submitting revised documents incorporating <br /> all comments soon. <br /> • NCDENR <br /> • Driveway permit-Approved <br /> • Erosion Control—Approved. <br /> Construction Overview <br /> • The Owner is will begin a re-roofing project at the site beginning Monday, February 9th with Muter Construction.The <br /> re-roofing contract is 60 days in duration. The Muter Construction will begin over the center section (community <br /> center) and then move out towards the wings..Any work that affects the roof must be performed by Muter <br /> Construction who is performing the re-roofing work in order to maintain the warranty. <br /> • The Owner is handling all abatement work separately from this construction contract.The abatement work <br /> excluding the windows associated with Alternate No.4 will be completed prior to the NTP for this project. <br /> Abatement work associated with Alternate No.4 will be handled by the Owner but need to be incorporated into <br /> your schedule if the alternate is accepted. <br /> • All construction documents except for items requiring color/finish selection will be transmitted electronically via <br /> Boomerang Design's Newforma system. <br />