Orange County NC Website
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> ADDENDUM TWO <br /> ADDENDUM NO.TWO <br /> to <br /> Contract Documents for <br /> boomerang <br /> b E S I G N <br /> CEDAR GROVE COMMUNITY CENTER RENOVATION <br /> Date: February 6,2015 6131 Falls of Neuse Rd.,Suite 204 <br /> Raleigh, North Carolina 27609 <br /> Boomerang Design (919)573-6400 <br /> Project No.: 1315 File: B-8.2 <br /> NOTICE TO BIDDERS: <br /> This addendum is issued pursuant to the General Conditions of the Contract for Construction, and is <br /> hereby made a part of the Contract Documents. <br /> The addendum serves to clarify, revise, and supersede information in the Project Manual, the Drawings <br /> and Addenda (if any),which have previously been issued. It should be bound in the Project Manual for the <br /> project. <br /> GENERAL: <br /> See Attached minutes from the Pre Bid Conference <br /> See Attached sign-in sheet from the Pre Bid Conference <br /> The Contractor awarded the work will be able to utilizing the existing utilities at the Cedar Grove building. <br /> The Owner will pay for the utility charges. <br /> Contractor's shall use the State of North Carolina Hub Vendor list when looking for HUB subcontractors. <br /> Orange County does not have a separate HUB Vendor list. <br /> Owner will have the Cedar Grove building open on Monday Feb. 9th and Tuesday <br /> Feb. 10th from 10 am — 2 pm for interested bidders to study the existing facility <br /> and renovation documents. <br /> ITEMS PERTAINING TO THE PROJECT MANUAL: <br /> Section 00 0110—Table of Contents:See revised renaming section 00 43 93 as"Bidder's Checklist" <br /> Section 00 43 93—Bidder's Checklist:See revised section adding"Contractor's Safety Record" Form as a <br /> required attachment to your bid. <br /> Section 00 72 00—General Conditions: <br /> Add the following items: <br /> 13.19 Contract Time—The Contractor shall commence work to be performed under this Contract <br /> on a date to be specified in a written order from the Contractor Officer; and shall fully complete all <br /> work hereunder within Three Hundred (300)calendar days following date of said order. For each <br /> day in excess of the aforementioned number of days,the Contractor shall pay to the Owner the <br /> ©BOOMERANG DESIGN#1315 Cedar Grove Community Center <br /> Orange County <br /> ADDENDUM#2 02/06/15 <br /> I <br />