Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> ADDENDUM TWO <br /> ADDENDUM NO.TWO <br /> to <br /> Contract Documents for <br /> boomerang <br /> b E S I G N <br /> CEDAR GROVE COMMUNITY CENTER RENOVATION <br /> Date: February 6,2015 6131 Falls of Neuse Rd.,Suite 204 <br /> Raleigh, North Carolina 27609 <br /> Boomerang Design (919)573-6400 <br /> Project No.: 1315 File: B-8.2 <br /> NOTICE TO BIDDERS: <br /> This addendum is issued pursuant to the General Conditions of the Contract for Construction, and is <br /> hereby made a part of the Contract Documents. <br /> The addendum serves to clarify, revise, and supersede information in the Project Manual, the Drawings <br /> and Addenda (if any),which have previously been issued. It should be bound in the Project Manual for the <br /> project. <br /> GENERAL: <br /> See Attached minutes from the Pre Bid Conference <br /> See Attached sign-in sheet from the Pre Bid Conference <br /> The Contractor awarded the work will be able to utilizing the existing utilities at the Cedar Grove building. <br /> The Owner will pay for the utility charges. <br /> Contractor's shall use the State of North Carolina Hub Vendor list when looking for HUB subcontractors. <br /> Orange County does not have a separate HUB Vendor list. <br /> Owner will have the Cedar Grove building open on Monday Feb. 9th and Tuesday <br /> Feb. 10th from 10 am — 2 pm for interested bidders to study the existing facility <br /> and renovation documents. <br /> ITEMS PERTAINING TO THE PROJECT MANUAL: <br /> Section 00 0110—Table of Contents:See revised renaming section 00 43 93 as"Bidder's Checklist" <br /> Section 00 43 93—Bidder's Checklist:See revised section adding"Contractor's Safety Record" Form as a <br /> required attachment to your bid. <br /> Section 00 72 00—General Conditions: <br /> Add the following items: <br /> 13.19 Contract Time—The Contractor shall commence work to be performed under this Contract <br /> on a date to be specified in a written order from the Contractor Officer; and shall fully complete all <br /> work hereunder within Three Hundred (300)calendar days following date of said order. For each <br /> day in excess of the aforementioned number of days,the Contractor shall pay to the Owner the <br /> ©BOOMERANG DESIGN#1315 Cedar Grove Community Center <br /> Orange County <br /> ADDENDUM#2 02/06/15 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.