Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cn <br /> FIXTURE SCHEDULE GENERAL NOTES SYMBOLLEGEND <br /> b&6m&ra0ng%, 11 <br /> < <br /> ",'a, Wg <br /> (D <br /> =Z=7 <br /> 0 <br /> (D <br /> RECtRCU—C PUMP(RP-1) <br /> DETAIL <br /> 06 -n <br /> 0 <br /> m <br /> C) <br /> NZC AUDI 11U 26(F)(I) <br /> Cn <br /> PROORES" <br /> 2 COLLABOPAnvg <br /> m <br /> m <br /> co <br /> 00 <br /> co <br /> 00 <br /> I—---- ------- --- <br /> Ou <br /> DETAIL 06 <br /> CONNECTION SCHEDULE m <br /> 0 <br /> F— m, L-7.7—j <br /> N.F C AAfICLE 116-26 <br /> DETAIL 05 CEDAR GROVE <br /> COMMUNITY CENTER <br /> LOAD SUMMARY <br /> DETAIL <br /> 06 WATER HAMMER ARRESTORS <br /> -77 <br /> vrntrrcw <br /> 131S <br /> ILM24 <br /> N=: <br /> SYMBOLLEGEND <br /> 's,7 4=C- <br /> FIXTURESCHEDULE <br /> NOTES&DETAILS <br /> TYPICAL EQUIPMENT CONNECTIONS <br /> II DETAIL 06 RETAIL 04 DETAIL 03 RETAIL 02 DETAIL 01 Pool <br /> ft w.n <br />
The URL can be used to link to this page
Your browser does not support the video tag.