Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> ADDENDUM NO.1 (ELECTRICAL) <br /> DATE: January 29,2015 L5 err <br /> �Eh <br /> PROJECT: Orange County Community Center ? t U�;84;� <br /> Cedar Grove f <br /> ARCHITECT- Ms_Angie Crawford r"�,��� ""' LD , <br /> Boomerang Design rlr�riirr+++ti''� i-24_1j <br /> ENGINEER: Progressive Design Collaborative, Ltd, <br /> 2800 Rowland Road, Suite 100 <br /> Raleigh,North Carolina 27515 <br /> PDC PROJECT#1 3057 <br /> The following items or modifications to the origirrnl Plans and Specifications shall be included as part of the <br /> contrnrt worts, Ali General Conditions. Suppiemental General Conditions,_ and Special Gondittons are as <br /> origlnafly spnclfied. <br /> Respective Bidders shelf include the provisions of this addendum in their proposal and shall make a notation <br /> in the proposal That these provisions have been inrfrudod. <br /> Chanties to Electrical Specifications: <br /> 1. Specification 26 67 79—Sound System (Gym) <br /> • Delete this specification in its entirety. <br /> 2. Specification 26 05 19—Wires and Cables <br /> Clarified that aJl conductors are to be copper,unless otherwise specified as aluminum on <br /> plans. <br /> Changes to Electrical Drawings: <br /> Drawing E001 <br /> • Clarified symbols <br /> • Deleted symbols <br /> • Revised light facture type TO <br /> Drawing E003 <br /> • Revised multipurposelstage sound riser. <br /> Drawing E005 <br /> • Revised power riser <br /> I <br /> Drawing F201 <br /> • Revised track lighting and exerciselstage 1101. <br /> • Added exit signs. <br /> Addendum No I(Electrical) Page 1 of 2 January 29,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.