Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> ADDENDUM NO, 7 {PLUMBING) `,;',q MCaf? <br /> +p•,�j��r <br /> �i <br /> DATE,, January 29, 2015 <br /> PROJPCT: Orange County Community Center "I _ <br /> Cedar Grove <br /> ARCH ITECT: Ms.Angie Crawford '4�! - ""•" *` <br /> Boomerang Design <br /> ENGINEER: Progressive Design Collaborative, Ltd. <br /> 290©Rowland Road, Suite 100 <br /> Raleigh, North Carolina 27615 <br /> PDC PROJECT#13057 <br /> The following ilon7s or modifirations to the original Plans and Specifications shall be included as part of the <br /> contract work. Afl General Condifion$, Supplemental General Conditions, and Special Conditions are as <br /> originally specified. <br /> Respective Bidders shall include the provisions of this Addendum in their proposai and shall make a notation <br /> in the proposal that these provisions have been included. <br /> Changes to Plumbing Drawlnas: <br /> Sheet Pool - <br /> Ftxture Schedule-Fixture S-1 Revised to include pipe wrap at supplies and trap. <br /> Sheet Pi 01 - <br /> Demolition Plan-Hose Bibb to be demolished added to}plan at building front. <br /> Changes to Plumbing Specifications: <br /> • Specification Section 22 13 16- <br /> STORM, SANITARY WASTE AND VENT PIPE AND FITTINGS (CAST IRON) <br /> to be replaced with <br /> Specification Section 22 1316- <br /> SANITARY WASTE AND VENT PIPE AND FITTINGS (PVC-DWV) <br /> END OF ADDENDUM NO.1 (PLUMBING) <br /> Attachments: FULL SIZED PLUMBING SHEETS(2) <br /> PLUMBING SPECIFICATION$FCTION(1) <br /> Addenrltim No.1(Plun1Cirm.)) Page 1 of 1 January-10,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.