Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> I <br /> t <br /> The owner will: <br /> a. Attend the scheduled prebid conference. <br /> b. Identify or determine those work areas of a contract where MBEs may have an <br /> interest in performing contract work. <br /> C. At least ten(10)days prior to the scheduled day of bid opening,the Owner will <br /> notify certified MBEs of potential contracting opportunities listed in the proposal. <br /> The notification will include the following: <br /> 1. A description of the work for which the bid is being solicited. <br /> 2. The date,time and location where bids are to be submitted. <br /> 3. The name of the individual within the agency/institution who will be <br /> available to answer questions about the project. <br /> 4. Where bid documents may be reviewed. <br /> 5. Any special requirements that may exist, such as insurance,licenses, <br /> bonds and financial arrangements. <br /> If there are more than three(3)certified MBEs in the general locality of the project who <br /> offer similar contracting or subcontracting services in the specific trade,the Owner shall <br /> notify three(3),but may contact more, if the Owner so desires. <br /> d. Maintain documentation of any contacts, correspondence,or conversations with <br /> MBE firms made in an attempt to meet the goals. <br /> 2. Prime Contractor <br /> Under the single prime contract system,the prime contractor will_ <br /> a. Attend the scheduled prebid conference. <br /> b. Identify or determine those work areas of a contract where MBEs may have an <br /> interest in performing contract work. <br /> C, At least ten(10)days prior to the scheduled day of bid opening,notify certified <br /> MBEs of potential contracting opportunities listed in the proposal. The <br /> notification will include the following: <br /> I. A description of the work for which the bid is being solicited. <br /> 2. The date,time and location where bids are to be submitted. <br /> 3. The name of the individual within the agency/institution who will be <br /> available to answer questions about the project. <br /> 4. Where bid documents may be reviewed. <br /> 5. Any special requirements that may exist, such as insurance,licenses, <br /> bonds and financial arrangements. <br /> If there are more than three(3)certified MBEs in the general locality of the project who <br /> offer similar contracting or subcontracting services in the specific trade,the Contractor <br /> shall notify three(3),but may contact more,if the Contractor so desires. <br /> d. During the bidding process,comply with the contractor(s)requirements listed in <br /> the proposal for minority participation. <br /> e. Submit with the bid a description of that portion of the work to be executed by <br /> MBEs expressed as a percentage of the total price. <br /> f. Identify the MBEs the bidder intends to use on the contract,along with the dollar <br /> amount of the work to be performed by each minority business. <br /> g. Submit an affidavit that details the good faith efforts taken to procure minority <br /> business participation. <br /> h. Upon being named the apparent low bidder,the bidder shall provide the necessary <br /> 3 <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.