Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> s <br /> DOCUMENT 00 43 22 BID FORM SUPPLEMENT•UNIT PRICES <br /> 1.1 BID FORM SUPPLEMENT <br /> A. This form is required to be attached to the Bid Form. See Document 00 21 13"Instructions to Bidders," <br /> 1.2 DESCRIPTION <br /> A. Each bidder shall show below the amounts proposed to be added to or deducted from the Base Contract Sum <br /> upon adjustment of the quantity given in Unit Price Allowances in Division 01, Section "Allowances" for the <br /> actual measurement of individual items of the Work. <br /> 1.3 SCHEDULE OF UNIT PRICES — (GENERAL CONSTRUCTION CONTRACTOR AND COMBINED SINGLE-PRIME <br /> CONTRACTOR) <br /> A. Unit rice No. 1: Rock Removal in Open Areas(Mass Rock)and Disposal Off-Site <br /> LtA aJ~ OLLARS($ Per cu.yd. <br /> B. Unit Price No.2: Rock Removal in Tenches and Pits(Trench Rock)and Disposal ^Off-Site <br /> DOLLARS($ per cu.yd. <br /> C. U-mitt Pric No.3: Unsuita le Soils Removal and Disposal Off-Site <br /> Y L � DOLLARS{$ .� per cu.yd. <br /> D. Unit Price No.4: Unsuitable Soils Removal and Disposal On-Site <br /> DOLLARS($ )per cu.yd. <br /> E. Uni rice No 5: Re la ement of Authorized Excavation of Unsuitable Soils or Rock with On-Site Suitable Soils <br /> r DOLLARS($_ )per cu.yd. <br /> F. Unit Price No. 6: Replacement of Authorized Excavation of Unsuitable Soils or Rock with Off-Site Suitable <br /> Soils <br /> DOLLARS($ f0,per cu.yd. <br /> G. Unit Price No. 7: Replacement of Authorized Excavation of Unsuitable Soils or Rock with Aggregate Base <br /> Cou se(ABC)Stone Material <br /> l DOLLARS($� )per cu.yd. <br /> H, Unit Price No. 8: Replacement of Authorized Excavation of Unsuitable Soils or Rock with#57 Washed Stone <br /> Mate'al <br /> Z OLLARS($ per cu.yd. <br /> I,Unit Price No. 9: Cutting and Pat of Concrete Slabs <br /> DOLLARS($ 0� per sq.ft. <br /> @BOOMERANG DESIGN#1315 00 43 22-1 Cedar Grove Community Center <br /> Orange County 11/11/14 <br /> ADDENDUM#3 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.