Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> DOCUMENT 00 43 21–BID SUPPLEMENT:ALLOWANCES i <br /> 11 BID FORM SUPPLEMENT <br /> A. This form is required to be attached to the Bid Form.See Document 00 2113"Instructions to Bidders." <br /> 1.2 DESCRIPTION <br /> A. Each bidder shall show below the cash amounts included in the Contract Sum for use at the direction of the <br /> Owner. <br /> B. The total for quantity allowances shall be the total cost using Document 00 43 22"Bid Supplement–Unit Pric- <br /> es" and the quantities from Section 0121 00"Allowances." <br /> C. The bidder shall be responsible for determining from the Contract Documents the affects of each Allowance on <br /> the Contract Time and/or Contract Sum. <br /> D. The Owner reserves the right to utilize funds identified under Allowances solely at the Owner's discretion and to <br /> amend the Contract accordingly during the period of the contract, <br /> 1.3 SCHEDULE OF ALLOWANCES–(GENERAL CONSTRUCTION CONTRACT) <br /> A. Quantity Allowance No 1: Ro k Removal in Open Areas(Mass Rock)and Disposal Off-Site//r��� <br /> Formula: ;& �— x 10 cubic yards = $ !! t4 . ©a <br /> (Contractor Unit Cost) (Total Cost To Be Included In Bid) <br /> B. Quantity Allowance No.2: Rock Removal in Trenches and Pitts(Trench Rock)and Disposal Off-Site <br /> Formula: �J.Q x 10 cubic yards = $ t�54,DO <br /> (Contractor Unit Cost) (Total Cost To Be Included In Bid) <br /> C. Quantity Allowance No.3:. U ns itable Soils Removal and Disposal On-Site <br /> Formula: .bd x 100 cubic yards = $ ��� <br /> (Contractor Unit Cost) (Total Cost To Be Included In Bid) <br /> D. Quantity Allowance No.4: Unsuit ble Soils Removal and Disposal Off-Site ,G� <br /> Formula: x 2500 cubic yards = $ <br /> (Contractor Unk Cost) - (Total Cost o Be Included In Bid) <br /> E. Quantity Allowance No. 5: Replacement of Authorized Excavation of Unsuitable Soils or Rock with On-Site Suita- <br /> ble Soils <br /> Formula: .5D x 100 cubic yards = $ <br /> (Contractor Unit Cost) (Total Cost To Be Included In Bid) <br /> F. Quantity Allowance No. 6: Replacement of Authorized Excavation of Unsuitable Soils or Rock with <br /> eel <br /> Off-Site Suita- <br /> ble Soils g /4/ <br /> Formula: � !`[i x 2000 cubic yards = $ ,^� <br /> (Contractor Onit Cost) (Total Cost To Be Included In Bid) <br /> G. Quantity Allowance No. 7: Replacement of Authorized Excavation of Unsuitable Soils or Rock with Aggregate <br /> Base Course(ABC)Stone Material <br /> Formula: -V`�_ x 400 cubic yards = $ . ©y <br /> (Contractor Unit Cost) {Total ,ost To Be Included In Bid) <br /> H. Quantity Allowance No. 8: Replacement of Authorized Excavation of Unsuitable Soils or Rock with#57 Washed <br /> Stone Material <br /> Formula: 419 4,?-1 x 100 cubic yards = $ <br /> (Contractor Unit Cost) (Total Usi To Be Included In Bid) <br /> I. Contingency Allowance No. 9: Provide$262,514 for an Owner Contingency Allowance <br /> $262.514.00 <br /> (Total Cost To Be Included In Bid) <br /> J. Contingency Allowance No. 10: Provide$7,500 include in Bid for waterproofing under resilient sports flooring and <br /> sheet vinyl flooring.Allowance usage to be determined based upon slab testing listed in the product specifications. <br /> $7,500 <br /> (Total Cost To Be Included In Bid) <br /> ©BOOMERANG DESIGN#1315 00 43 21 -1 Cedar Grove Community Center <br /> Orange County 11!11114 <br /> ADDENDUM#3 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.